Similar Projects
Force Main Replacement
Bidding
Collegedale, Ooltewah, TN 37363

Raise & Lower Manholes for TN State Paving Projects for WRD
Term Contract
Bidding
Chattanooga, TN

Sanitary Sewer Mainline Full Wrap Service Connection
Post-Bid
Chattanooga, TN

Lupton City Mill Sewer Relocation
Post-Bid
Chattanooga, TN 37405

Focused SSES and Rehabilitation - South Chickamauga Creek 1 - Phase 2
Results
Less than $2,500,000 est. value
Chattanooga, TN 37405

Former Harriet Tubman Homes Site Sewer Relocation
Results
Chattanooga, TN 37406

Utility Service for East Ridge Splash Pad
Bidding
East Ridge, TN

Sewer Line Cleaning Services
Post-Bid
Chattanooga, TN 37402

WWTA Contract to Raise Existing Manhole Frames
Results
Chattanooga, TN 37402

Hixson Marina Cove Slip Lining
Bidding
Hixson, TN 37343

East Ridge Basin 1-75 Collector Sewer Project
Post-Bid
Chattanooga, TN 37402

Dobbs Branch Basin Improvements Phase 2
Results
Less than $9,598,525 est. value
Chattanooga, TN 37405

East Ridge Sewer Basin 3C and 4B Rehabilitation
Post-Bid
Chattanooga, TN

Dobbs Branch Basin Improvements Phase 1
Results
Chattanooga, TN 37402

Air/Vacuum Relief Valve Service
Post-Bid
Chattanooga, TN 37405

Reported 03/12/2021 12:00 AM
Project Title

Lupton Drive Chronic SSO Elimination

Physical Address View project details and contacts
City, State (County) Chattanooga, TN 37400   (Hamilton County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of approximately 1,491 LF of existing 15-inch RCP gravity sewers with new 21-inch PVC gravity sewers, installation of approximately 557 LF of new 21-inch PVC gravity sewers by dig-and-lay methods, abandonment of approximately 594 LF of 15-inch RCP gravity sewers, approximately nine (9) 4-foot diameter manhole replacements, abandonment of two (2) 4-foot manholes, new installation of one (1) 4-foot manhole, re-connection of sewer laterals; and all appurtenant and incidental materials and equipment, complete and in kind placed in accordance with the Contract Documents for the project. Allotted time for construction is 270 days.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents