Similar Projects
Trillium Water Campus and Potable Wells
Infrastructure
Bidding
$500,000 est. value
Phoenix, AZ

WAPA DSW: Oil/Water Separator and Sewer Lift Preventative Maintenance
Post-Bid
Phoenix, AZ

Materials and Equipment for Well 21 Repair
Term Contract
Post-Bid
Luke Air Force Base, Peoria, AZ 85309

Water/Wastewater Pumps
Results
Mesa, AZ 85203

Pump Maintenance, Repair and Purchase - As Needed (Western Region State Parks)
Results
Phoenix, AZ 85085

Construction Project Drilling and Installation of the Pulte Rio Caballo Well No.1
Infrastructure
Post-Bid
Surprise, AZ 85387

Irrigation Pump Maintenance
Term Contract
Results
$25,000 est. value
Scottsdale, AZ

HVAC Parts, Repair Services and Pump Rebuilds
Alteration
Post-Bid
Glendale, AZ

Pump Maintenance, Repair and Purchase - As Needed (Northern Region State Parks)
Term Contract
Results
Phoenix, AZ

Tartesso Unit 3A Well No. 4 Drilling Project
Alteration
Post-Bid
Buckeye, AZ

SPA 1 Recharge Expansion CMAR
Results
Surprise, AZ 85379

Trillium Phase 1 Well #3 Drilling Project
Alteration
Post-Bid
Buckeye, AZ

District Drywell Projects
Results
Mesa, AZ

Red Mountain High School Storm Pump Replacement
Infrastructure
Post-Bid
$125,000 est. value
Mesa, AZ 85207

Well Pump and Well Booster Pump Repair/Replacement, Maricopa, AZ
Results
Maricopa, AZ 85138

Reported 06/16/2022 03:26 PM
Project Title

Groundwater Well Rehabilitation - CIPWA61048 - City of Glendale

Physical Address View project details and contacts
City, State (County) Glendale, AZ 85301   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected December 2022
Bids Due View project details and contacts
Estimated Value $8,790,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Assess water production and water quality at 14 groundwater wells. Rehabilitation of well, pump and electrical as needed. As of June 15, 2022, this project is currently in the City of Glendale's FY 2022-2031 CIP. Information regarding a design team and the contractor selection has not been disclosed. A firm timeline for construction has not been established.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents