Similar Projects
Signing and Delineation - Gravel Roads
Infrastructure
Conception
$1,507,000 CJ est. value
Mc Intosh, SD 57641

Signing and Delineation - Gravel Roads
Infrastructure
Conception
$1,507,000 CJ est. value
Mc Intosh, SD 57641

US 212 - Fm Eagle Butte to LaPlant
Infrastructure
Design
$10,499,000 CJ est. value
La Plant, SD 57652

US 212 - Fm Eagle Butte to LaPlant
Infrastructure
Design
$10,499,000 CJ est. value
La Plant, SD 57652

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

AC Surfacing, Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$9,194,000 CJ est. value
Watauga, SD 57660

US212 - Fm Dupree through Eagle Butte
Infrastructure
Design
$7,274,000 est. value
La Plant, SD 57652

Underground Infrastructure Inspection
Infrastructure
Post-Bid

Cold Milling Asphalt Concrete, Asphalt Concrete Resurfacing (90K ton) and Pipe work
Infrastructure
Results

Signals, Sidewalk, CE
Infrastructure
Conception
$275,000 CJ est. value
McLaughlin, SD 57642

Grading, Interim Surfacing, Replace Str Bridge
Infrastructure
Design
$16,715,000 CJ est. value
Watauga, SD 57660

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Last Updated 01/31/2023 07:35 AM
Project Title

SD63 - Fm the Us212 E Jct to N of the Moreau River

Physical Address View project details and contacts
City, State (County) Trail City, SD 57657   (Corson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $14,249,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SD63 - Fm the Us212 E Jct to N of the Moreau River Length 16.7 As of January 31, 2023, the project is in design status. Anticipated Construction year is 2023. SDDOT - SD63 - Fm the Us212 E Jct to N of the Moreau River *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents