Similar Projects
Last Updated 12/15/2021 07:47 AM
Project Title

Traffic Signal Construction Upon Request on Various Routes

Physical Address View project details and contacts
City, State (County) (Buncombe, Burke, Madison, McDowell, Mitchell, Rutherford, Yancey Counties)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Bidding on Hold
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1 Sp High Priority Mobilization 50 Ea 2 Sp Furnish And Operate Line Truck On Emergency Mobilization 80 Hr 3 Sp Furnish And Operate Bucket Truck On Emergency Mobilization 80 Hr 4 Sp Technician Labor On Emergency Mobilization 80 Hr 5 Sp Technician Helper On Emergency Mobilization 80 Hr 6 Sp $1.00 Worth Of Material - (Cost Plus %) 265,000 Ea 7 Sp Technician (Electrician) With Vehicle 2,500 Hr 8 Sp Helper 2,500 Hr 9 Sp Remove Traffic Signal Cabinet 20 Ea 10 Sp Remove And Dispose Of Cabinet Foundation 10 Ea 11 Sp Remove And Dispose Of Signal Cable 8,000 Lf 12 Sp Louver 25 Ea 13 Sp Install Vehicle Signal Head (Single And Multiple Section) 200 Ea 14 Sp Install Vehicle Signal Head With Multiple Optically Programmed Sections 200 Ea 15 Sp Install Pedestal Mounted Signal Head 30 Ea 16 Sp Install Pedestal Pole With Pedestrian Signal Head 50 Ea 17 Sp Install Pedestrian Signal Head On Pole 50 Ea 18 Sp Install Messenger Cable 12,000 Lf 19 Sp Furnish And Install 2" Pvc Conduit (Unpaved Trenching) 12,000 Lf 20 Sp Furnish And Install 2" Rigid Metallic Conduit (Unpaved Trenching) 12000 Lf 21 Sp Furnish And Install 2" Pvc Conduit (Underground) 200 Lf 22 Sp Furnish And Install 2" Rigid Metallic Conduit (Underground) 200 Lf 23 Sp Furnish And Install 2" Pvc Conduit (Paved Trenching) 650 Lf 24 Sp Furnish And Install 2" Rigid Metallic Conduit (Paved Trenching) 650 Lf 25 Sp Directional Boring With 2" Hdpe Conduit 1,250 Lf 26 1716 Junction Box (Standard) 150 Ea 27 1716 Junction Box (Oversized) 20 Ea 28 Sp Furnish And Install 35 Ft Class 3 Wood Pole 60 Ea 29 Sp Furnish And Install 40 Ft Class 3 Wood Pole 10 Ea 30 Sp Furnish And Install 45 Ft Class 3 Wood Pole 5 Ea 31 Sp Furnish And Install Anchor And Rod Assembly 150 Ea 32 Sp Furnish And Install Normal Guy Assembly 150 Ea 33 Sp Furnish And Install Sidewalk Guy Assembly 15 Ea 34 1722 1/2" Riser With Weatherhead 25 Ea 35 1722 1" Riser With Weatherhead 50 Ea 36 1722 2" Riser With Weatherhead 125 Ea 37 1725 Inductive Loop Sawcut 35,000 Lf 38 Sp Install Lead-In Cable 2,000 Lf 39 1730 Communications Cable (24-Fiber) 3000 Lf 40 1730 Communications Cable (60-Fiber) 3,000 Lf 41 1730 Communications Cable (96-Fiber) 3,000 Lf 42 1730 Drop Cable 10 Lf 43 1731 Interconnect Center 10 Ea 44 1731 Splice Enclosure 10 Ea 45 1731 Modify Splice Enclosure 10 Ea 46 1732 Fiber-Optic Transceiver - Drop And Repeat 10 Ea 47 1732 Fiber-Optic Transceiver - Self Healing Ring 10 Ea 48 1733 Delineator Marker 20 Ea 49 1734 Remove Existing Communications Cable 2,000 Lf 50 1735 Cable Transfer 10 Ea 51 1743 Type i Post With Foundation 25 Ea 52 1743 Type Ii Pedestal With Foundation 25 Ea 53 1743 Type Iii Pedestal With Foundation 20 Ea 54 1745 Sign For Signals 25 Ea 55 1747 Led Blankout Signs 5 Ea 56 1747 Relocate Existing Blankout Sign 5 Ea 57 Sp Install Controllers With Cabinet (Base Mounted) 20 Ea 58 Sp Install Controllers With Cabinet (Pole Mounted) 20 Ea 59 Sp Install Pole Mounted Flasher Cabinet 3 Ea 60 1757 Traffic Signal Removal 250 Ea 61 Sp Strap Wire(s) To Existing Spanwire 5,000 Lf 62 Sp Adjust Existing Span 50 Ea 63 Sp Furnish And Install Meter Service (New Install) 35 Ea 64 Sp Furnish And Install Meter Base And Disconnect To Existing Service (Upgrade) 10 Ea 65 Sp Install Lead-In Underground (In Existing Conduit) 3,000 Lf 66 Sp Install Lead-In Overhead 6,000 Lf 67 Sp Furnish And Install 26 Ft Powder Coated Metal Strain Pole (Cost +10% Per $1.00) 11,500 Ea 68 Sp Furnish And Install 30 Ft Powder Coated Metal Strain Pole (Cost +10% Per $1.00) 158,000 Ea 69 Sp Furnish And Install 35 Ft Powder Coated Metal Strain Pole (Cost +10% Per $1.00) 22,000 Ea 70 Sp Metal Pole Removal 2 Ea 71 Sp Furnish And Install Powder Coated Single Mast Arm Pole (Cost +10% Per $1.00) 76,500 Ea 72 Sp Furnish And Install Powder Coated Double Mast Arm Pole (Cost +10% Per $1.00) 105,000 Ea 73 Sp Soil Excavation For Pole Foundation (Auger Hole) 200 Cy 74 Sp Rock Excavation For Pole Foundation 30 Cy 75 Sp Steel Reinforced Pier Grade Concrete Foundation 300 Cy 76 Sp Concrete Foundation Removal 30 Cy 77 Sp Soil Test For Metal Pole Foundation 60 Ea 78 Sp Remove Pole 150 Ea 79 Sp Remove And Transport Pole To Specified Location 20 Ea 80 Sp Relocate Existing Pole 5 Ea 81 Sp Transport And Install Ncdot Furnished Wood Pole 15 Ea 82 Sp Transport And Install Ncdot Furnished Metal Strain Pole 15 Ea 83 Sp Transport And Install Ncdot Furnished Metal Pole w/ Mast Arm 15 Ea 84 Sp Install Ncdot Furnished Sign Post 20 Ea 85 Sp Excavate Rock For Wood Pole Installation 50 Cy

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents