Similar Projects
Tennis Center - Construction - Town of Flower Mound
Infrastructure
Conception
$12,250,000 CJ est. value
Flower Mound, TX 75022

Cultural Arts Center
New Construction
Conception
Flower Mound, TX 75028

Peabody Hotel
New Construction, Infrastructure - 345,130 SF
Design
$98,000,000 CJ est. value
Roanoke, TX 76262

Lakeshore Plaza Mixed-Use Development
New Construction - 51,815 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Little Elm, TX 75068

Pike Middle School Replacement
New Construction - 250,000 SF
Post-Bid
$94,620,000 est. value
Justin, TX 76247

Admissions Building Foundation Stabilization
Infrastructure
Post-Bid
Denton, TX

Annual Requirements Contract for Directional Boring
Term Contract
Results
Arlington, TX

Harvest Phase 11A and 11B Mass Grading
Infrastructure
Results
TX

Village at Lewisville
New Construction - 324,668 SF
Construction
$10,000,000 CJ est. value
Lewisville, TX 75057

Alexan The Point
New Construction
Construction
Flower Mound, TX 75028

Aloft / Lewisville
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Lewisville, TX 75067

Interior Logic Group / The Offices 3 at Frisco Station
Renovation - 17,681 SF
Pending Verification
$1,150,000 CJ est. value
Frisco, TX 75034

Garabedian Office Building
New Construction - 4,946 SF
Design
$500,000 est. value
Roanoke, TX 76262

Pecan Square Phase 3A and Mulkey Lane Improvements for Clearing and Mass Grading
Infrastructure
Post-Bid
Northlake, TX

Earthwork and SWPPP Improvements for Big Sky Estates Phase 2
Infrastructure
Results
Denton, TX

Last Updated 01/23/2023 11:36 AM
Project Title

Lakeside Manor Apartments

Physical Address View project details and contacts
City, State (County) Little Elm, TX 75068   (Denton County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Office, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $7,040,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work will include interior renovations to the apartments and clubhouse/leasing office and miscellaneous exterior improvements, and site improvements. As of January 23, 2023, construction is underway. The owner is acting as the general contractor.

Details

147,500 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents