Similar Projects
Alki Permanent Standby Generator
Alteration
Design
$6,000,000 est. value
WA

Cooling Tower Fill & Drift Eliminator Replacement
Renovation
Bidding
$60,000 CJ est. value
Vancouver, WA 98660

2022/2023 River Pump Station 1 and River Pump Station 2 Electrical Improvements Project
Renovation
Sub-Bidding
$320,000 CJ est. value
Pasco, WA 99301

Electrical On-Call Portwide 2022-4 and 2022-5
Term Contract
Sub-Bidding
$300,000 CJ est. value
Seattle, WA 98164

Medina Pump Station MCC and Generator Replacement
Renovation, Alteration
Post-Bid
$2,300,000 est. value
Medina, WA 98039

Electrical Construction Work Order 2021-2022
Term Contract, Alteration
Post-Bid
WA

North South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

Bellevue Library Elevator Modernization for Car #3
Alteration
Results
Bellevue, WA 98007

Campus Electrical Grid Security Feeder 17 Expansion Project
Renovation
Construction
$856,000 CJ est. value
Ellensburg, WA 98926

Pioneer Turko Fiber Construction project
Infrastructure
Sub-Bidding
$700,000 CJ est. value
Seabeck, WA 98380

Auxiliary Utility Facility Generator Maintenance
Term Contract, Alteration
Post-Bid
Seattle, WA

Deception Creek Line Extension
Infrastructure
Results
$2,235,825 est. value
WA

Motor Refurbishment and Rewind Services
Renovation
Sub-Bidding
Richland, WA 99352

Battery Electric Bus Infrastructure Transformer Purchase
Alteration
Post-Bid
WA

Lakeland Hills Pump Station Generator Install
Renovation, Alteration
Results
$1,190,000 est. value
Auburn, WA 98092

Last Updated 09/06/2022 07:34 AM
Project Title

State of Washington Military Department Generator Install

Physical Address View project details and contacts
City, State (County) Moses Lake, WA 98837   (Grant County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Electrical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

A. Work shall include providing of labor, equipment, materials, products, finishes, accessories, furnishings, specialties, supplies, tools, equipment, transportation, utilities, services, superintendence, taxes, overhead and profit, and civil, and electrical improvements for total construction of the Project in strict conformance with the Contract Documents. 1. Workmanship and installation procedures regarding materials, equipment, and products listed in this specification and indicated on the Drawings shall follow published industry standards unless specified and detailed differently to a higher standard. 2. Failure to comply with published or detailed workmanship or installation procedures will result in installer removing defective workmanship and installations and providing new work at no additional cost to the Owner. 3. Materials and systems shown on the Drawings and specifications are part of the Contract Documents Work and shall be installed complete as part of Project. Conflicts in the Work shown or specified do not relieve the Contractor and his subcontractors from performing the Work. No additional compensation will be awarded if any Work is shown on the Drawings and/or in the Specifications, whether or not they are in conflict with each other. Provide new generator and ATS Provide new panelboards and transformer. Replace existing parking lot light fixture beads with new. Please direct questions regard-ing this project to Jon Beade of Hargis Engineers 206-436-0465 The Owner has Federal Funding or other special require. ments for this project. The Bidder will be required to comply with the DIVISION 00 SPECIAL CONDITIONS section in the specifications. Please direct ques-tions regarding his subject. to the office of the Consultant. The successful Bidder is required to register and create an account in the DES Diversity Compliance program electronically. Voluntary numerical MWBE goals of 10% MBE, 6% WBE, 5% Washington Small Business, and 5% Veterans have been established for this project. Achievement of the goals is encouraged. The State reserves the right to accept or reject any or all propos-als.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents