Similar Projects
Vicinia
New Construction
Conception
San Antonio, TX 78251

SOFTBALL FIELD UPGRADE
Infrastructure
Design
$300,000 CJ est. value
San Antonio, TX 78224

RCCG Salvation Center San Antonio / 1406 Pinn Road
New Construction, Infrastructure - 30,700 SF
Design
$2,500,000 CJ est. value
San Antonio, TX 78227

FY18 Vehicle Maintenance Shop, Camp Bullis
New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
San Antonio, TX 78257

US 281 - Landscape Development
Infrastructure
Bidding
$979,127 CJ est. value
San Antonio, TX 78208

IH0035 - Installation of Flashing Beacons and Ped
Infrastructure
Sub-Bidding
$2,925,000 CJ est. value
San Antonio, TX 78208

Inspection, Service and Replacement of Fire Extinguishers
Term Contract
Sub-Bidding
San Antonio, TX 78205

T.L. Shaley Unit Conversion
Post-Bid
$80,000 to $110,000 est. value
San Antonio, TX 78228

HEB - Turn Lane Improvements
Post-Bid
San Antonio, TX

Thea Meadows Unit 4 Subdivision
Results
San Antonio, TX 78275

Paso Del Norte Street (Shady Oaks)
Infrastructure
Results
$1,579,900 est. value
San Antonio, TX 78232

Cornerstone Commerce Center
New Construction, Infrastructure - 413,173 SF
Construction
$32,067,840 CJ est. value
San Antonio, TX 78219

Amazon Remodel Project UTX8
Demolition, New Construction, Infrastructure - 10,130 SF
Pending Verification
$1,695,000 CJ est. value
San Antonio, TX 78218

Texas Biomedical Research Institute Animal Care Complex
Addition, Demolition, New Construction, Infrastructure - 41,300 SF
Pending Verification
$10,000,000 CJ est. value
San Antonio, TX 78227

Cherry Court Residential
New Construction
Design
$2,300,000 est. value
San Antonio, TX 78202

Last Updated 08/01/2022 03:06 PM
Project Title

Sapphire Grove - Phase 3A

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78205   (Bexar County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

KFW ENGINEERS is currently accepting sealed bids for SAPPHIRE GROVE PHASE 3A

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents