Similar Projects
Construct New Terminal Building Site Work - Phase 2 (20027)
Renovation, Infrastructure
Results
Winchester, VA 22602

Rehabilitate Air Carrier Apron
Renovation
Post-Bid
$6,224,700 est. value
Norfolk, VA 23521

Modernize a Building Recently Acquired by the FAA
Renovation
Bidding
$10,000,000 to $20,000,000 est. value
Warrenton, VA 20187

Miscellaneous Building Repairs and Alterations, Ronald Reagan Washington National Airport (DCA)
Renovation
Bidding
Arlington, VA 22202

Hanover Municipal Airport East Side Terminal
Construction
Ashland, VA

Dulles International Airport Proposes New 14-Gate Concourse - Tier-2 Concourse (East)
New Construction - 400,000 SF
Conception
$230,000,000 est. value
Dulles, VA 20166

SWA Relocation and FIS Facility Renovations
Renovation
Results
$10,000,000 est. value
Richmond, VA 23250

Construct Terminal Apron Aircraft Parking Positions
Results
$207,025 est. value
Lynchburg, VA

Airport Terminal Building
New Construction - 16,346 SF
Bidding
$6,100,000 est. value
Winchester, VA 22602

Police Firing Range Facility Maintenance, Washington Dulles International Airport (IAD)
Renovation
Post-Bid
$250,000 est. value
Sterling, VA 20166

Danville Airport Terminal Building Renovations
Renovation
Results
Danville, VA 24540

Turkish Lounge Refresh
Renovation - 2,000 SF
Post-Bid
Dulles, VA 20166

ORF Concourse A Expansion
Construction
Norfolk, VA

Design, Construction, Management and Operation of General Aviation Facility and Fixed Based Operator
Renovation
Post-Bid
Richmond, VA 23250

Reported 06/10/2022 12:00 AM
Project Title

On-Call General Construction Services

Physical Address View project details and contacts
City, State (County) Richmond, VA   (Richmond City County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope shall consist of a General Contractor providing routine maintenance and minor construction or repair services at various Airport facilities with minimal administrative efforts for the Richmond International Airport ("Airport"). The scope of work shall include but is not limited to 1. Priming and painting wall surfaces. 2. Wall repair. 3. General Construction 4. Light industrial electrical. 5. General plumbing. 6. General HVAC work.

Details

Airline/Passenger Terminal, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents