Similar Projects
A/E Services For The Risk Management Center Which Includes Projects Within The United States And Its Territories For Dam And Levee Safety And Other Work As Assigned To Usace
Design
$15,000,000 est. value

A/E Services For The Risk Management Center Which Includes Projects Within The United States And Its Territories For Dam And Levee Safety And Other Work As Assigned To Usace
Design
$15,000,000 est. value

Design-Build Services Bissell and Lemay WWTF Fluidized Bed Incinerators
New Construction
Bidding
Saint Louis, MO

Design-Build Services Bissell and Lemay WWTF Fluidized Bed Incinerators
New Construction
Bidding
Saint Louis, MO

Engineering, Planning and Development
Post-Bid

Engineering, Planning and Development
Post-Bid

Mercy Ballas Multispecialty Building
New Construction - 272,000 SF
Construction
$10,000,000 CJ est. value
MO

Z1DZ--657-21-711JB EHRM Cerner Admin Space Construction Support - Jefferson Barracks
New Construction, Addition
Design
Saint Louis, MO 63125

North Villanova Drive Sinkhole Repair
Term Contract
Bidding
MO

Land Use Review Services
Post-Bid
Crestwood, MO

Architectural and Engineering oversight of the Construction Process
New Construction, Infrastructure
Bidding
Saint Louis, MO

Kirkwood School District for Architectural Services 2021
Renovation
Post-Bid
Kirkwood, MO

Long-Range Transportation Plan
Infrastructure
Bidding
Saint Louis, MO

Professional Engineering and Design Services 20th Street Multimodal
Infrastructure
Post-Bid
Saint Louis, MO

Comprehensive Architectural, Engineering and Design Services - District-Wide
New Construction, Infrastructure
Bidding
Saint Louis, MO

Reported 08/14/2021 12:00 AM
Project Title

Renovate Optometry for New Procedure Suite

Physical Address View project details and contacts
City, State (County) Saint Louis, MO   (Saint Louis County)
Category(s) Medical, Professional Services
Sub-Category(s) Architectural, Engineering, Hospital
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Design Firm shall provide basic professional services and construction period of services to create a minor procedure room for the Ophthalmology section within the Optometry Clinic of the VA Saint Louis Healthcare System, John Cochran division. Design team shall create complete package of Construction Documents to meet applicable design standards and building codes, to include but not limited to Executive Order 13693. Construction package shall meet all requirements outlined in IDIQ contract. A/E shall provide a design to create a Class A Surgical Procedure Room, a sterile surgical tray delivery area, soiled utility room, patient recovery area and patient/family waiting area for the Ophthalmology section within the Optometry Clinic. VASTLHCS John Cochran Building 1 is an existing 11 story building with multiple additions that contains multiple medical services and clinics. Within the building is an Optometry Clinic on the first floor that lacks this procedure room. The design team shall survey each room and the utility systems that serve the room. The construction (and therefore design) includes demolition, hazardous material abatement (Industrial Hygiene) if needed, architectural, structural, carpentry, safety and infection measures, and other items. Project will create a minor procedure room for the Ophthalmology section within the Optometry Clinic. Class A surgical procedures are minor surgical procedures performed under topical, local, or regional anesthesia without preoperative sedation. In addition to the procedure room, this project will create a sterile surgical tray delivery area, soiled utility room, patient recovery area and patient/family waiting area. Project will require a total of ~952 DGSF. Total Project Costs include funding for new HVAC systems as needed to support this new procedure room. The justification is that it expands services provided to VASTLHCS' Veterans within the Optometry Clinic by providing a Class A Ophthalmology Surgical Procedure Room, which is currently not available. The design team shall provide all necessary design, estimation, and construction period services to complete the project. The design team shall create a complete package of construction documents to meet applicable design standards and building codes, to include but not limited to VHA Design Criteria for the listed rooms. Construction package shall meet all requirements outlined in the IDIQ contract. The design team shall survey each room and the utility systems that serve the room. Phasing may be required and shall be determined during design by both the A/E Firm and the VA Integrated Project Team.

Details

Architectural, New Construction, Hospital, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Support Assemblies, Healthcare Metal Supports.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Service Walls, Patient Bed Service Walls, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Protective Covers.
Division 11 - Equipment, Mercantile and Service Equipment, Vending Equipment, Foodservice Equipment, Ice Machines, Cleaning and Disposal Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Operating Room Equipment, Solid Waste Handling Equipment.
Division 12 - Furnishings, Window Blinds, Casework, Furniture, Seating, Institutional Furniture, Healthcare Furniture.
Division 13 - Special Construction, Radiation Protection.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems, Healthcare Intercommunications and Program Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Radiation Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents