Similar Projects
Installation of Security Cameras and Fiberoptic Wiring at Yale Acres
Infrastructure
Design
$400,000 CJ est. value
Meriden, CT 06450

Relocation and Rebuild of 115-kV Electric Transmission Lines
Infrastructure
Design
$550,000 CJ est. value
New Haven, CT 06510

Electrical system for new field lights and field outlets at Wilbur Cross
Renovation
Sub-Bidding
$510,000 CJ est. value
New Haven, CT 06511

S & C Loadbuster Disconnect And Siemens Vector Switches
Alteration
Post-Bid
Wallingford, CT

Wired Upgrade
Term Contract
Post-Bid
New Haven, CT

Electrical Trade Package - Cornell Scott Hill Heath Center/Dixwell Community House
Alteration
Results
New Haven, CT

Standby Generator Services
Term Contract
Results
Colebrook, Goshen, Middlebury, Naugatuck, Stamford, Thomaston, CT

Single Phase Kilowatt Hours Meters
Alteration
Post-Bid
Wallingford, CT

Stage, Sound and Light Production
Alteration
Results
Cheshire, CT 06410

Single Phase Padmount Transformers
Term Contract
Post-Bid
Wallingford, CT 06492

Single Phase Pole Mount Transformers
Alteration
Results
Wallingford, CT

Three Phase, Switched Capacitor Banks, Pole Mounted
Alteration
Post-Bid
Wallingford, CT

Single Phase Padmount Transformers
Alteration
Results
Wallingford, CT

Contractors for Electrical, Plumbing, and HVAC
Term Contract
Post-Bid
Naugatuck, CT

Three Phase Padmount Tranformers
Alteration
Results
Wallingford, CT

Last Updated 05/01/2023 02:06 PM
Project Title

Remove and Replace Stage Lighting at Daniel Hand High School

Physical Address View project details and contacts
City, State (County) Madison, CT 06443   (New Haven County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $442,530 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The High School (HS) stage is in the primary assembly space. The students perform three (3) major theatrical productions per year. The first production is generally a comedy or drama. The second performance is generally a musical. And the third is the STAR (Student Theater Arts Repertoire) program. This space is utilized to support this active dramatic arts program in addition to serving as the primary HS assembly space. The existing lighting system is outdated and in need of modernization. It is the intention of this project to provide a modern energy efficient lighting system to support the quality theatrical programming offered by the HS. Lighting shall be replaced, lighting, lighting controls, and support systems shall be modified, in accordance with the drawings, specifications, and contract documents herein. All onsite work including demolition and installation will happen over the course of 7 weeks during the 2023 Summer School break period. All work is to be done under Prevailing Wage, Bid bonds and Performance bonds are required, as specified within. To obtain a complete description of the work, interested persons may obtain copies of the Contract documents via the Town Website, State Contracting Portal, or emailing Racquel Stubbs stubbsr@madisonct.org, Madison Facilities. Questions regarding the project should be addressed to Racquel Stubbs stubbsr@madisonct.org, Madison Facilities, and Blair Richardson blair.richardson@collierseng.com, Owners Project Manager, 284 Green Hill Road, Madison, Connecticut, 06443, 203-245-6470 (telephone).

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents