Similar Projects
Bender Lane Multi-Family Development
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Sheridan, WY 82801

Bender Lane Multi-Family Development
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Sheridan, WY 82801

SCSD 2 Maintenance Facility Safety Upgrades and Repairs
Renovation, Infrastructure - 9,360 SF
Design
$450,000 CJ est. value
Sheridan, WY 82801

Terra-Turner Waterline Replacement
Infrastructure
Bidding
$900,000 CJ est. value
Sheridan, WY 82801

South Downtown Project
Infrastructure
Bidding
$700,000 CJ est. value
Sheridan, WY 82801

Z--MATOC - IMR Bridges
New Construction
Post-Bid
$10,000,000 est. value

Wolf Creek Road Reconstruction Project
Infrastructure
Post-Bid
$240,000 CJ est. value
Ranchester, WY 82839

Burgess Road (Nfsr #15) Road Improvements
Term Contract
Results
$500,000 to $1,000,000 est. value
Sheridan, WY 82801

Byron Streets (US 14A)
Infrastructure
Results
Sheridan, WY

Riverstone Park Residential Subdivision
New Construction, Infrastructure
Construction
$25,400,000 CJ est. value
Sheridan, WY 82801

Riverstone Park Residential Subdivision
New Construction, Infrastructure
Construction
$25,400,000 CJ est. value
Sheridan, WY 82801

Falcon Motors Manufacturing Complex
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Sheridan, WY 82801

Falcon Motors Manufacturing Complex
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Sheridan, WY 82801

North Sheridan Interchange - City of Sheridan
Infrastructure
Conception
$700,000 CJ est. value
Sheridan, WY 82801

2022 Pavement Maintenance
Infrastructure
Post-Bid
$270,000 est. value
Sheridan, WY

Last Updated 06/23/2023 05:07 AM
Project Title

Cedar Creek Driveway Trail Bridge Replacement

Physical Address View project details and contacts
City, State (County) Sheridan, WY 82801   (Sheridan County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project Title: Cedar Creek and Driveway Trail Bridge Replacements, Bighorn National Forest (NF), Region 2, Wyoming. Driveway Trail Bridge Description of Work- The work for the Driveway trail bridge includes but is not limited to the removal of the existing bridge structure, the installation of a 61' glulam stringer trail bridge with timber sill on geocell pad, aggregate surfacing, riprap placement and all other incidental items necessary to complete the project in accordance with plans and specifications. Cedar Creek Trail Bridge Description of Work- The work for the Cedar Creek trail bridge includes but is not limited to the removal of the existing bridge structure, the installation of a 40' glulam stringer trail bridge with timber sill on geocell pad, an optional item for existing trail restoration and all other incidental items necessary to complete the project in accordance with plans and specifications. Project Location - Driveway Trail Bridge Location- From Sheridan, Wyoming, head south on interstate 90 for approximately 31 miles to exit 56A towards Buffalo, Wyoming. Continue on this road for approximately 2 miles, then turn right onto US-16 West. In approximately 46 miles, turn right at the junction of NFSR #27. Travel on NFSR #27 for approximately 2 miles. From here, there is a native surface unimproved road for 0.3 miles to within approximately 100' of the bridge site. Trail Bridge coordinates: 44 11' 40.20" N, -107 14' 35.16" W Cedar Creek Trail Bridge Location - From Sheridan, Wyoming, head north on interstate 90 for approximately 11 miles to exit 9. Head westbound on US-14 for approximately 52 miles to the junction of NFSR #264 (Cedar Creek Rd.). NFSR #264's approach is a narrow, steep, four-wheel drive road for the first 1.3 miles. At the location of Trail 055, the four-wheel drive road ends and the road becomes a trail for the next mile to the bridge site. For the remaining 1 mile, currently the trail conditions would not allow access for an ATV. There is an optional work item for the reconstruction of the 1 mile of trail to provide access to the bridge site with an ATV. It is anticipated that the bridge stringers and other materials will need to be delivered to the site using a helicopter. Trail bridge coordinates: 44 36' 16.88" N, -107 39' 17.43" W. Project Title: Cedar Creek and Driveway Trail Bridge Replacements, Bighorn National Forest (NF), Region 2, Wyoming. Driveway Trail Bridge Description of Work- The work for the Driveway trail bridge includes but is not limited to the removal of the existing bridge structure, the installation of a 61-glulam stringer trail bridge with timber sill on geocell pad, aggregate surfacing, riprap placement and all other incidental items necessary to complete the project in accordance with plans and specifications. Cedar Creek Trail Bridge Description of Work- The work for the Cedar Creek trail bridge includes but is not limited to the removal of the existing bridge structure, the installation of a 40-glulam stringer trail bridge with timber sill on geocell pad, an optional item for existing trail restoration and all other incidental items necessary to complete the project in accordance with plans and specifications. NAICS Code: 237310 - Highway, Street, and Bridge Construction PSC Code: YlLB - Construction of Highways, Roads, Streets, Bridges, and Railways Size Standard for NAICS: $45M Project Magnitude - $250,000.00 and $500,000.00 The offeror is required to comply with the Department of Labor Davis Bacon-Act Wage Determinations for this effort. Wage Determinations can be found at https://www.sam.gov/. All Amendments to the Solicitation must be acknowledged in Block 19 at time of proposal or by submitting the signed SF-30(s) with your price proposal. For any questions regarding this Solicitation please contact Contract Specialist, Holly Hlavac at Holly.Hlavac@usda.gov. Questions Due: 5/23/2023 at 9:00 AM Pacific Standard Time (PST) Proposals Due: 6/21/2023 at 9:00 AM PacĂ­fic Standard Time (PST) Questions and Proposals are to be submitted to Holly Hlavac at Holly.Hlavac@usda.gov. Attachment 1 - Cedar Creek Bridge Plans Attachment 2 - Driveway Bridge Plans Attachment 3 - Trail Specifications Attachment 4 - Schedule of Items Attachment 5 - Wage Determination Big Horn County Delivery: 11/14/2024 Delivery Location Code: 8538 BIGHORN NATIONAL FOREST TONGUE RANGER DISTRICT 2013 EASTSIDE 2ND ST SHERIDAN WY 82801-9638 US Period of Performance: 07/17/2023 to 11/14/2024 Driveway Trail Bridge Description of Work- Continued

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents