Similar Projects
Provide Structural Repairs - Construction Work
Renovation
Bidding
$10,000,000 CJ est. value
Albany, NY 12207

Provide Snow Guards, Roof Repairs and Masonry Repointing
Renovation
Bidding
$3,000,000 CJ est. value
Albany, NY 12224

Ready Mix Concrete
Term Contract
Sub-Bidding
Goshen, NY 10924

Ready Mix Concrete
Term Contract
Sub-Bidding
Goshen, NY 10924

Design Build Services for Indefinite Quantity Repairs to Miscellaneous Structural Steel,Concrete and Masonry Components
Term Contract, Alteration
Post-Bid
$100,000,000 est. value
New York, NY

Installation of Concrete Pads for Bus Shelters
Term Contract
Post-Bid
Albion, Batavia, Canandaigua, Lyons, Mount Morris, Rochester, Warsaw, Waterloo, NY 14609

West Street IRA Deck Replacement
Alteration
Results
Less than $50,000 est. value
Oneonta, NY 13820

Town Hall Generator and Installation
Renovation
Results
$61,000 CJ est. value
Newcomb, NY 12852

Bond and Capital Improvement Projects At North Middle School
Renovation
Bidding
$2,600,000 CJ est. value
Great Neck, NY 11023

Turf Protection Tiles
Term Contract
Sub-Bidding
Mexico, NY 13114

Removal and Repair of Structural Concrete
Term Contract
Post-Bid
NY

Primary Settling Tanks Equipment Replacement and Concrete Repair
Infrastructure
Results
Beacon, NY

Bond and Capital Improvement Projects at North Middle School
Renovation
Bidding
$178,000 CJ est. value
Great Neck, NY 11023

Phase 3 Capital Improvements - Site Contractor Work (SC-1)
Renovation, Infrastructure
Sub-Bidding
$250,000 CJ est. value
Clinton, NY 13323

Sealing of Structural Concrete
Term Contract
Post-Bid
NY

Last Updated 03/28/2023 02:19 PM
Project Title

Malone CSD - 2021 Capital Project Phase 2 Contract No. 07 - Auditorium Seating Contractor (ASC) (COOP)

Physical Address View project details and contacts
City, State (County) Malone, NY 12953   (Franklin County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,150,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Owner, the School Board of Malone Central School District, will receive sealed bids to furnish materials and labor to complete the 2021 Capital Project Phase 2 which includes construction of science lab renovations, art classroom renovation, auditorium renovation, pool renovation, masonry repairs, roof membrane replacement, HVAC upgrades and window replacements. Each bid shall be on a stipulated sum basis for the following contracts: Davis Elementary School SED No. 16-15-01-06-0-018-008 Flanders Elementary School SED No. 16-15-01-06-0-017-012 St. Josephs Elementary School SED No. 16-15-01-06-0-011-008 Malone Middle School SED No. 16-15-01-06-0-001-016 Franklin Academy SED No. 16-15-01-06-0-019-021 The 2021 Capital Project (Phase 2) includes science lab renovations, an art classroom renovation, an Auditorium renovation, a pool renovation, masonry repairs, roof membrane replacement, HVAC upgrades, window replacements, site upgrades, various maintenance repairs and a Pre-K Addition. The scope takes place across five building locations. Bidder must provide Bid Security in the amount and form, per the conditions provided in Section Instructions to Bidders. All Bids will remain subject to acceptance for forty-five (45) days following the receipt of Bids. The Owner may, in its sole discretion, release any Bid and return Bid Security prior to that date. Bids shall not include New York State sales and compensating use taxes on materials and supplies incorporated into the Work, as the Owner being exempt therefrom. Bidders must comply with New York Sate Department of Labor Prevailing Wage Rate Schedule and conditions of employment. The School Board of Malone Central School District reserves the right to waive any informalities or irregularities in the Bids received, or to reject all Bids without explanation. SCOPE: The Work consists of the following, but not limited to: 1. Middle/ High School; Alterations and Reconstruction work to these areas: Main Office Suite, Nurse's Suite, Guidance Suite, Science Rooms, LGI 21st Century space and Maker Space/Esports Classroom, Corridors, Stairwells, Art display, and Toilet Rooms. Infrastructure replacement including window and shade replacement, exterior and interior door replacement, heating unit upgrades, flooring replacement, ceiling replacement, LED lighting upgrades and masonry cleaning. MC Range $900K to $1.15M Project # 2020007 Commencement of construction (On-Site Activities): April 3, 2023.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents