Similar Projects
Metro Center - Master Plan
New Construction
Design
Aurora, CO 80012

Metro Center - Parcel A
New Construction
Design
Aurora, CO 80012

Riser Rings
Term Contract
Post-Bid
CO

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Greenwood Gulch Undercrossing Improvements
Results
Greenwood Village, CO

Greenwood Gulch Undercrossing
Results
$250,000 to $350,000 est. value
Centennial, CO 80111

Legacy at Metro Center
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Aurora, CO 80011

Centennial Medical Plaza
New Construction, Renovation, Infrastructure - 61,000 SF
Pending Verification
$7,000,000 CJ est. value
Centennial, CO 80112

Metro Center - Parcel B
New Construction
Design
Aurora, CO 80017

Asphalt Repair FCI Englewood
Term Contract
Post-Bid
Littleton, CO

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

New Gate Church Youth Center
New Construction, Infrastructure - 11,832 SF
Pending Verification
$3,000,000 CJ est. value
Aurora, CO 80013

Centennial Medical Plaza Center
New Construction, Renovation, Infrastructure - 61,000 SF
Design
$20,000,000 CJ est. value
Centennial, CO 80112

2021 Roadway Improvements Project
Infrastructure
Post-Bid
Bow Mar, CO

On Call Region 1 Asphal Paving Services
Results

Last Updated 09/23/2022 01:02 AM
Project Title

2022 Caley Greenwood Sewer Project

Physical Address View project details and contacts
City, State (County) Littleton, CO 80120   (Arapahoe County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work will involve installation of public sanitary sewer main in Littleton, Colorado. The work will include modification to an existing manhole, installation of (1) 10-foot deep manhole, (1) 20-foot deep manhole with intermediate platform, 308 linear feet of 2-foot valley gutter, 109 linear feet of 4-inch plastic pipe, 736 linear feet of 8-inch plastic pipe, 5 service taps, surface restoration, curb, gutter, sidewalk, asphalt mill and overlay, and roadway striping. Work is located in both streets and vegetated areas of public and private properties. Traffic control, erosion control, testing and post CCTV of the installed main will be required. General Requirements - Bid Deposit Required - Contractors License Required - FOB Destination - FOB Pre-Paid - Installation Required - Insurance Required Bonding Requirements - Bid Bond 5 % Job Location West Caley Avenue and South Greenwood Question Acceptance Deadline 09/22/2022 01:00 PM EDT Questions are submitted online No TIME OF COMPLETION: 90 calendar days

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents