Similar Projects
Willard Parkway Landscaping Epoch Drive To Kammerer Road - WFL011 - City Of Elk Grove
Alteration
Conception
$875,400 est. value
Elk Grove, CA 95757

Rental Car Building Curbside and Parking Area Modification - P200711 - Sacramento County
Infrastructure
Conception
$1,078,000 est. value
Sacramento, CA 95837

MUNI - Design Review - Northpointe Reserve - Dahlin Group
New Construction, Infrastructure
Design
Sacramento, CA 95835

Prime Data Centers Sacramento Building 2
New Construction, Infrastructure - 150,000 SF
Design
$150,000,000 est. value
Sacramento, CA 95652

Modify Ramp Metering Systems
Infrastructure
Post-Bid
CA

West Silver Eagle Bridge and Overhead Joint Repair
Renovation, Infrastructure
Post-Bid
$565,560 est. value
Sacramento, CA 95834

Sierra Highway Sidewalks
Infrastructure
Results
$375,000 est. value
Sacramento, Santa Clarita, CA 91390

Modify Ramp Metering Systems
Infrastructure
Results
$910,000 est. value
Sacramento, CA 95811

B.T. Collins Youth Detention Facility - Visitor's Center - Americans with Disabilities Act - Public Interior
Renovation
Conception
$3,990,000 est. value
Sacramento, CA 95827

Construct Curb Ramps, Sidewalks and Modify Signal Systems
Infrastructure
Post-Bid
$2,520,000 est. value

Police Facilities Streetscapes Maintenance
Infrastructure
Results
Sacramento, CA

Category III Instrument Landing System and Runway Lighting - P000437 - Sacramento County
Infrastructure
Conception
Less than $8,300,000 est. value
Mather, CA 95655

Maintenance and Repair of Curbs, Gutters, Sidewalks, and Related Items
Infrastructure
Post-Bid
Sacramento, CA

Folsom Boulevard Complete Streets Phase 1
Infrastructure
Results
$5,400,000 est. value
Sacramento, CA

Reconstruct Airport Access Road - P000449 - Sacramento County
Alteration
Conception
$470,000 est. value
Elk Grove, CA 95757

Last Updated 07/14/2022 03:52 AM
Project Title

Design Build - Construct Parking South East Campus

Physical Address View project details and contacts
City, State (County) Mather, Rancho Cordova, CA 95655   (Sacramento County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Objectives: This project is to construct 350 new parking and 12 ADA parking stalls for a total of 362 parking stalls. The design build contractor shall coordinate with ongoing design within the site, this includes Oncology and Medical Specialty Project. The contractor shall coordinate with existing and ongoing construction projects. The design build contractor shall ensure the grading plan coincides with existing grading with the surrounding area and connecting roadways to existing parking lots and roadways on campus using the Mather Land Development Project documents. A full traffic control shall be required where needed for any road disturbances shall be the responsibility of the contractor. A plan shall be provided by the contractor for approval by VA. Any road access involving a delivery interrupting traffic on or off campus shall include traffic control. The contractor shall provide vacuum excavation at all utility crossing points on campus. Weekend work will be required for all road closures that need to occur. The Design Build Contractor shall provide all security and offset fencing that meets VA Physical Security Design Guide. All permits required to be obtained by the contractor and paid for by the contractor, city encroachment permits and inspections, etc. B. Project Scope: - Site Development: The design shall use the area north of the gravel lot, per attached previously mentioned Mather Land Development Project document. Fencing for force protection is required as the project is a utility extension. The Design Build Contractor shall use and meet the Mission Critical Physical Design Manual for VA Facilities requirements outlined within. It is suggested to provide a 8 high, anti-climb, high grade metal fence in accordance with VA criteria. Fencing to be similar to the existing fencing in area of water tower and southern parking lot. The Design Build Contractor shall provide 10 security cameras for full coverage of the parking lot. Cameras need to be compatible to what is used in the facility what are Tyco Illustra Pro 5MP domes. The Design Build Contractor shall provide 3 Emergency Call Boxes, 2 in the North East lot and 1 in the Western lot. Emergency boxes to match the facility are RATH call boxes model 2100-TSC Cellular Solar Tower models. The Design Build Contractor shall provide proper phasing of construction activities to avoid disruption to VA services. Construction in the parking areas will be phased to allow traffic access to all parking spaces not directly affected by construction. Trenching, laying pipe, and paving will be sectioned to block half or less of the parking. Road cuts crossing the roadway will be coordinated with VA officials to minimize traffic flow issues. Phased access required for Medical Specialties Project. - Site Utilities: Plumbing seismic requirements shall comply with VA Publication H-18-8, Seismic Design Requirements. All construction work is to be during normal hours, 7:30AM to 4:00PM. Any work that creates noise loud enough to impact patient operations, disturb patients or staff is to be accomplished after working hours. All outages and outages are after hours. Submit outage notice 30 days in advance of the outage date for approval. All SWPPP CA state permitting and monitoring shall be required for the project and is the contractors responsibility. All NEPA and environmental documentation required shall be developed and managed by the Design Build Contractor. The scope of AE services shall include the following: Preliminary site investigation of the planned project location and temporary trailer site location. Development of a complete stamped and signed design package including all appropriate trades which, at a minimum, should include: architect, civil, structural, mechanical, electrical and plumbing for the project. See Mather Land Development for additional information. Development of a complete stamped and signed design package including all appropriate trades which, at a minimum, should include: architect, civil, structural, mechanical, electrical and plumbing for the project. Construction period services including, but not limited to: submittal review, RFI review and responses, weekly construction site visits, and reviews and emergency phone or on-site responses as issues arise.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents