Similar Projects
Big Papllion Sewer Siphon Replacement - SEWR-23-001 - City of La Vista
Infrastructure
Conception
$450,000 CJ est. value
La Vista, NE 68128

Bellino at Cedardale Mixed-Use
New Construction, Infrastructure
Conception
$135,000,000 CJ est. value
Papillion, NE 68046

New Jail Development - Sarpy County
New Construction, Infrastructure - 146,000 SF
Design
$68,500,000 CJ est. value
Papillion, NE 68046

Aspen Creek Phase 6
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Gretna, NE 68028

Gretna Middle School #3 - Bid Package 4
New Construction, Infrastructure
Bidding
$65,000,000 CJ est. value
Richland Viii, NE 68028

Gretna Middle School #3 - Bid Package 5
New Construction, Infrastructure - 160,200 SF
Bidding
$65,000,000 CJ est. value
Richland Viii, NE 68028

RFQ D/B - NKO Campus, NKO Facility and Courier Station
New Construction, Infrastructure - 425,000 SF
Post-Bid
$500,000,000 CJ est. value
Offutt AFB, NE 68113

RFQ D/B - NKO Campus, NKO Facility and Courier Station
New Construction, Infrastructure - 425,000 SF
Post-Bid
$500,000,000 CJ est. value
Offutt AFB, NE 68113

Offutt AFB Security Campus
New Construction - 30,300 SF
Results
$50,000,000 to $90,000,000 est. value
Offutt Air Force Base, NE

Papio Creek Intake Damper Replacement
Infrastructure
Results
$915,000 CJ est. value
Bellevue, NE 68123

Stadium Team Meeting Room Building - Papillion LaVista Public Schools
New Construction, Infrastructure - 4,950 SF
Construction
$940,500 CJ est. value
Papillion, NE 68046

Gretna Crossing Park - Passive Park Improvements
New Construction, Renovation, Infrastructure
Construction
$7,583,000 CJ est. value
Gretna, NE 68028

Nebraska Crossing
Addition, New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Gretna, NE 68028

Crisis Stabilization Center - Sarpy County
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Bellevue, NE 68005

Hell Creek Rehab - Olive Street - STRT24003 - City of La Vista
Infrastructure
Conception
$250,000 CJ est. value
La Vista, NE 68128

Last Updated 04/02/2023 11:42 PM
Project Title

RFQ D/B - NC3 Alert Campus

Physical Address View project details and contacts
City, State (County) Offutt AFB, NE 68113   (Sarpy County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Military Facility, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $148,978,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Award Details Contract Award Date: Mar 31, 2023 Contract Award Number: W9128F23C0013 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: DMFWBVTL9324 Contractor Awarded Name: Walsh Federal, LLC Contractor Awarded Address: Chicago, IL 60607-3021 USA Base and All Options Value (Total Contract Value): $148,978,000.00 Project Number: 1080930 Design and construct a multi-story alert force facility (13,292 Square Meters) which includes a watch floor, controlled space, crew and maintainers' sleeping quarters, kitchen and dining areas, fitness areas, administrative spaces, storage spaces, classrooms, an auditorium, mechanical and electrical and telecommunication rooms, loading area, one passenger/freight elevator, simulator high bay with overhead crane, and support space and will also include a recycling center (46 Square Meters). Additionally, the project includes a family visitation facility (472 Square Meters) having 5 family rooms, one multi-use kitchen, large multi-use room, toilets, and in-processing center, with an attached communication hut which will provide secure voice/data to the entire campus. The project also includes a low-rise aircraft maintenance/spares storage building (2,128 Square Meters) with open space for aircraft spares boxes, offices, open administrative area, restrooms, breakroom, ground support equipment (GSE) rework shop with repair bay, work area, tools, drive-through areas, restrooms, and a fenced outdoor layout/storage area. Support facilities include paving, walkways, curbs & gutter, lighting, security fencing, outdoor recreational areas, earthwork, storm water mitigation, sanitary sewer, water, and natural gas. The project will comply with all applicable DoD, Air Force, and base design standards. The project will use local materials and construction techniques where cost effective. The Contractor must design facilities as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, "General Building Requirements" and UFC 1-200-02, "High Performance and Sustainable Building Requirements." This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, "DoD Minimum Antiterrorism Standards for Buildings" and include cybersecurity measures per UFC 4-010-06, "Cybersecurity of Facility-Related Control Systems."

Details

143,074 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents