Similar Projects
Regionwide Replacement of Pavement Markings
Infrastructure
Bidding
$5,000,000 to $20,000,000 est. value
Edwards, CO

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

Palisade Asphalt Repair Projects June 2021
Infrastructure
Post-Bid
Palisade, CO

Road Overlays Program
Results
$150,000 to $200,000 est. value
Fruita, CO 81521

2020 Fruita Roundabouts Project
Results
Fruita, CO

PMAA, RMCR, Asphalt Maintenance
Infrastructure
Post-Bid
Palisade, CO 81526

Centerra Parcel 301 Public Infrastructure
Results
$1,000,000 to $1,500,000 est. value

Z--Blm-Co - Rabbit Valley Roads and Parking
Term Contract
Post-Bid
$25,000 to $100,000 est. value
CO

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2022 Road Overlay Project
Infrastructure
Post-Bid
Fruita, CO

Kinston Residential Phase 1B Public Infrastructure
Results
$1,500,000 to $2,000,000 est. value

Mesa County Overlay 2022
Infrastructure
Post-Bid
Whitewater, CO

Lorey Drive Improvements Project
Results
Less than $200,000 est. value
Grand Junction, CO 81505

2022 Contract Street Maintenance - Asphalt Overlays
Term Contract, Infrastructure
Post-Bid
Grand Junction, CO

SH 141 North of Naturita Surface Treatment
Results
$5,000,000 to $20,000,000 est. value

Last Updated 05/25/2022 03:41 PM
Project Title

2022 Chip Seal Pavement

Physical Address View project details and contacts
City, State (County) CO   (Mesa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Contractor shall pre-oil area with HFMS-2P or CRS2R at a rate of .36 gallons per square yard, minimum. 2. Contractor shall apply 3/8” fractured face rock chip, or approved, applied at a minimum of 22 to 24 lbs per square yard. 3. Contractor shall compact with rubber tired roller within 15 minutes after rock application. 4. After one week of streets being fully open to normal vehicular traffic, contractor shall recover lose chips and haul to designated site within the City of Fruita city limits. 5. Contractor shall Apply HFMS-2P or CRS2P Fog Seal at a rate of 0.12 gallons per square yard.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents