Similar Projects
UC Boulder Masterplan
New Construction, Renovation
Conception
Boulder, CO 80309

Standing Order Contractor Program
Bidding
Less than $50,000 est. value
Boulder, CO 80303

Notice #19-27-Cp272988-Seel Rm 185C Cosinc Chr Lab Renovatio
Renovation
Post-Bid
Less than $600,000 est. value
Boulder, CO 80303

Notice #19-32-Pr01026/Hsg11122-C4c-Ofc Suite Renovations
Renovation
Post-Bid
Less than $650,000 est. value
Boulder, CO

Cu Boulder Mse/Rasei Suite Renovation
Renovation - 8,425 SF
Results
Less than $1,000,000 est. value
Boulder, CO 80303

SEEL-RM 356A-COSINC-FAB Construction Management / General Contracting Services
Results
$3,500,000 est. value
CO

Notice 19-26-SLL(NPL)-FS-SwtchGr-Lab Reno Projects
Renovation
Construction
$1,500,000 est. value
Boulder, CO 80309

ECCE Room 100 - Bold Center Remodel
Renovation
Construction
Less than $680,000 est. value
Boulder, CO 80309

Case- Accomodated Testing Center
Build-Out
Post-Bid
Boulder, CO

Notice 20-05-Cp282088-Muen-E412-18 Reno & Cp292026-Muen-D044
Renovation
Results
Less than $750,000 est. value
Boulder, CO 80309

UMC - Remodel Reception Desk and Room 235
Renovation
Post-Bid
$580,000 est. value
Boulder, CO

CU Boulder - Farrand Hall Maintenance
Results
Less than $1,638,000 est. value
Boulder, CO 80309

Building Renovations & Deck Replace, Deplex Deck Replacement
Post-Bid
$1,035,000 est. value
Boulder, CO

1135BRD - 1135 Broadway Renovations
Renovation - 14,740 SF
Post-Bid
Less than $3,600,000 est. value
Boulder, CO 80309

Ucb000270-Stne-Kitchen Maintenance-2021-Rfp-Dbb
Post-Bid
Less than $544,000 est. value

Last Updated 01/08/2020 01:31 PM
Project Title

Notice #19-25-Pr010107/Hsg11132-Aden & Brkt-Maint

Physical Address View project details and contacts
City, State (County) Boulder, CO 80303   (Boulder County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value $750,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work will occur throughout Aden and Brackett Halls. Work includes but is not limited to; • Removal of multiple layers of carpet and pad as well as removing Vinyl Asbestos Tiles. • Installation of new LVT. • Cleaning and refurbishment of mechanical elements throughout the building. • Painting and new flooring in various locations throughout the building. • Miscellaneous electrical, plumbing, and mechanical work. • Physical Construction start date is May 11, 2020 with Final Completion of July 31, 2020. General Contractor services to provide demolition and complete construction of all items listed in the contract documents, which include all items above, including required electrical, plumbing, fire suppression, and HVAC services.

Details

2 College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents