Similar Projects
NTP Vertical Turbine Pump Rebuild
Bidding
Brighton, CO 80603

Colorado City Artesian Well 4584-F
Bidding
Colorado City, CO

Water Right Due Diligence - Arkansas River Basin
Post-Bid
Denver, CO

Carmichael Park Vault
Post-Bid
Brighton, CO 80601

2019 Alluvial Well Improvements
Results
Less than $2,000,000 est. value
Commerce City, CO

Repair by Replacing Domestic Water Pumps B420
Results
$1,000,000 to $5,000,000 est. value
Colorado Springs, CO

Non-Potable Pond Pump Station
Construction
Brighton, CO 80601

MMAARS 6 Well Project
Bidding
Denver, CO

South Suburban Littleton Golf Course Well # 1
Post-Bid
Littleton, CO

Six Denver Basin Aquifer Wells Drilling Project
Results
Denver, CO

Directional Boring and Trenching
Bidding
Fort Collins, CO

On Call Alluvial Well Maintenance & Repair
Post-Bid
Castle Rock, CO

EC, Provide Sump Pump and Controls
Results
Loveland, CO 80537

2020 On Call Deep Well Repair
Post-Bid
Castle Rock, CO 80109

2020 Well Maintenance Project
Results
Less than $279,000 est. value
Aurora, CO 80016

Last Updated 11/06/2020 09:40 AM
Project Title

Law Enforcement Training Facility - Domestic Water Well

Physical Address View project details and contacts
City, State (County) Greeley, CO 80632   (Weld County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To drill a domestic water well for a soon to be constructed Law Enforcement training facility. The new facility will be located at 58676 County Road 23, Carr, Colorado. The site rests on Weld County Road 23 between Weld County Road 118 & 120 The project scope involves: 1. Drill a well sufficient to provide a water supply of ten gallons per minute. Other local water wells have been in the 540-feet and 780-feet deep range. 2. The appliances served in the facility are seven toilets, seven hand wash sinks and six showers that will receive use daily. 3. Install well casings, grout, screens etc. to prevent surface contamination, seasonal water and sediment from entering the well. 4. Water well contractor will be required to install the water well pumping system and appropriate water line and electrical stub outs. This will allow the building contractor to connect to them.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents