Similar Projects
Construction of Lago Mar Pod 3 Detention, Pod 4 Detention & Channel Revision
Bidding
TX

Phase II Detention Improvements and Mass Grading for Sunset Grove Sections 3, 4, 5, & 6 & Partial Ambrose Section 1 and Ditch 9G Improvements
Bidding
TX

Steel Riveted Corrugated Metal Pipe
Post-Bid
Texas City, TX 77591

14th Street Ditch Improvements
Post-Bid
Texas City, TX 77590

Landing Ditch Improvements at FM 518
Results
Less than $550,000 est. value
League City, TX

Bacliff Villas Drainage Restoration
Results
Less than $800,000 est. value
Galveston, TX 77550

Sedona Section 7 Detention
Bidding
TX

Sabine Pass to Galveston Bay Port Arthur & Vicinity Contract 2
Post-Bid
$20,000,000 est. value
Galveston, TX

Legas Drive Bulkhead
Results
$236,169 est. value
Galveston, TX 77550

Reinforced Concrete Pipe, Curb Inlets, Catch Basins, and Joint Sealer Annual Contract
Term Contract
Bidding
Texas City, TX

Canal System Restoration, Project Site Group I
Post-Bid
Texas City, TX 77591

9th and 11th Avenue Drainage Restoration
Results
Less than $400,000 est. value
Galveston, TX 77550

Deer Ridge Buyout and Overland Flow Improvements
Bidding
$2,700,000 est. value
League City, TX 77573

Steel Riveted Corrugated Metal Pipe
Post-Bid
Texas City, TX

Landing at Delany Cove Detention Facilities Phase II
Results
La Marque, TX 77568

Last Updated 02/11/2020 08:51 AM
Project Title

Water, Sanitary, and Drainage Facilities in Lago Mar Pod 5 Section 1

Physical Address View project details and contacts
City, State (County) TX   (Galveston County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,096,990
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work of the Contract includes the construction of water, sanitary, and drainage facilities in Lago Mar Pod 5 Section 1.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents