Similar Projects
Emergency Generator Replacement
Alteration
Bidding
$700,000 est. value
Mankato, MN 56001

Wireless Network Equipment and UPS Infrastructure
Alteration
Bidding
Moorhead, MN

DNR R4 Banning SP EV Charging Station
Post-Bid
Sandstone, MN

Replacement of UPS at the Minnesota Department of Health
Term Contract
Post-Bid
$40,000 to $60,000 est. value
Saint Paul, MN 55155

Replace UPS and Electrical Distribution System - Subbid
Results
Less than $519,113 est. value
Saint Paul, MN 55155

115kV Transmission Line Construction
Results
Detroit Lakes, MN

Boeckman MS Auditorium Lighting and Lighting Control Systems Replacement
Post-Bid
Farmington, MN 55024

Mndot Neshap Generator MOD at Maplewood Materials Lab 21-140207
Results
$125,000 est. value
Maplewood, MN 55109

Outdoor Electrical Services
Term Contract
Post-Bid
Bloomington, MN

Fridley Campus Electrical Rehabilitation-Switchgear
Results
Minneapolis, MN

Supervisory Control and Data Acquisition (SCADA) for Electrical Distribution System at Camp Ripley
Infrastructure
Post-Bid
Little Falls, MN 56345

JC Courtroom AV Upgrades
Results
Shakopee, MN 55379

Solar System Renovation
Alteration
Post-Bid
Rosemount, MN 55068

MNDOT Heath Creek Rest Area Control Panel & Fence Upgrades
Results
$75,000 est. value
Faribault, MN 55021

Install Load Bank Connection at the Senate Building
Alteration
Post-Bid
$82,170 est. value
Saint Paul, MN 55155

Last Updated 11/22/2021 04:20 PM
Project Title

Upgrade Electrical Grid - Deputy Hall Power Upgrades

Physical Address View project details and contacts
City, State (County) Bemidji, MN   (Beltrami County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $550,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Scope: Removal/replacement of several pieces of electrical distribution equipment within the Deputy Hall. This includes the removal and replacement of the service entrance switchboard, the replacement of several step-down transformers on first, second, and third floors with one single transformer in the basement, the replacement of several branch panels on first, second, and third floors, and the removal of an existing MCC

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents