Last Updated 06/03/2020 08:06 AM
Project Title

Design-Build Edinburg Pump Station Levee Rehabilitation

Physical Address View project details and contacts
City, State (County) Hidalgo, TX   (Hidalgo County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Design-Build. Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a solicitation (negotiated) for the design and construction (design-build) of rehabilitation improvements for the Rio Grande levee at Edinburg Pump Station in Hidalgo County, Texas. The pump station is operated by Hidalgo County Irrigation District No. 1 (HCID1). The proposed work is to be performed to provide flood control to the area and provide levees that meet FEMA requirements (44 CFR 65.10) and U.S. Army Corps of Engineers' Engineering Manual 1110-2-1913. The proposed project generally consists of design and construction of approximately 800 linear feet of levee improvements, including earthen embankment, concrete floodwalls, and associated ramps. The proposed levee rehabilitation design will include analysis/investigations of the existing levee for seepage remediation and raising the top of levee as needed, conducting any additional geotechnical investigations and testing required, and assessing all structures within the levee for rehabilitation. The major construction efforts include, but are not limited to, preparing right-of-way, removing/stockpiling existing excavated material, levee widening, erosion control, installing two new sections of floodwall with bollard walls, construction of floodwall foundations, completing construction of an existing gatewell structure, backfilling and grading of levee embankment material, installing aggregate roadway surface, removal and replacement of chain link fencing, and revegetation. The proposed work is located completely within the United States in the USIBWC Lower Rio Grande Flood Control Project but is directly adjacent to the international border with Mexico. The pump station is located at PeƱitas, Texas and the levee segments are located adjacent to the pump station. While proposed work will be located on USIBWC right-of-way, the Contractor would have to obtain a construction easement from HCID1. The levee is also adjacent to the Department of Homeland Security (DHS) border wall. HCID1 has constructed a portion of floodwall on the gap between their pump house and USIBWC's levee. The proposed work will require coordination with HCID1 to tie-in the design and construction to the floodwall they built. Coordination with their contractor may also be required. Design and construction would include appropriate levee tie-in to the pump house structure and account for sensitivity in working adjacent to the pump house. The proposed levee improvements at the border wall would also require incorporating DHS tactical infrastructure requirements and coordination with DHS to design and construct a bollard wall as part of the floodwalls.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents