Similar Projects
St Elizabeths East - Phase II
New Construction - 256,000 SF
Conception
$10,000,000 CJ est. value
Washington, DC

Buzzard Point - Phase II
New Construction
Conception
Washington, DC 20003

International Square Complex
New Construction, Renovation
Design
Washington, DC 20006

DOC A Phase 2D Tenant Build Out, St Elizabeths West Campus
New Construction, Build-Out - 117,950 SF
Bidding
$10,000,000 to $20,000,000 est. value
Washington, DC

The Flats at South Capitol
New Construction - 107,068 SF
Sub-Bidding
$10,000,000 CJ est. value
Washington, DC 20032

Pension Benefit Guaranty Corporation Offices
Renovation - 433,000 SF
Post-Bid
Washington, DC 20024

Enlightened
Build-Out - 16,156 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Washington, DC 20020

GSA 11 D/B 6th Floor Short Wing Modernization at the New Executive Office Building
Results
$1,000,000 to $5,000,000 est. value
Washington, DC

Redevelopment of Fletcher-Johnson
Results
Washington, DC 20019

N Street Offices
Renovation
Construction
Washington, DC 20036

Reunion Square Development
New Construction - 421,100 SF
Construction
$10,000,000 CJ est. value
Washington, DC 20001

Northeast Heights
New Construction - 200,000 SF
Pending Verification
$10,000,000 CJ est. value
Washington, DC

Parkside - Parcel 9
New Construction
Pending Verification
Washington, DC

The Wharf Development
New Construction, Demolition - 6,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Washington, DC 20024

2100 M Street NW
New Construction, Renovation, Addition - 420,244 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Washington, DC 20037

Reported 02/17/2022 12:00 AM
Project Title

O`Neill House Re-Design

Physical Address View project details and contacts
City, State (County) Washington, DC   (District of Columbia County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The CAO is interested in acquiring the services of a contractor to perform design services for the U.S. House of Representatives’ (House) O’Neill House Office Building (OHOB) relocation and space planning effort. The House intends to use both modular case-goods and open office systems furniture in the OHOB offices that the contractor will be responsible for the design services as outlined. The CAO requires the contractor to review the current O’Neill building space plans and provide recommendations on furniture layouts based on the current furniture product that is installed in the building. Additionally, if other furniture size options are deemed feasible, the contractor should provide testfit layout options in 2D, and 3D drawings.

Details

Office, Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents