Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Post-Bid

Y--Price Canyon Recreation Site Road Improvements
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Moenave Trail Improvements
Results

300 West Reconstruction from 900 South to 2100 South
Results

Construction Services for Land Excavation and Grading Work at Jackson Flat Reservoir
Infrastructure
Post-Bid
Kanab, UT

Dfcm Construction - Dnr Coral Pink State Park Asphalt Upgrades
Results
$240,000 est. value
Kanab, UT

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Post-Bid

S Roadway Improvements
Results

US-89 Orderville TWLTL and Sands Passing Lane Ext
Infrastructure
Post-Bid
$4,000,000 to $6,000,000 est. value
UT

Construction of the East Zion SSD - Fire Station Paving
Infrastructure
Results
$74,735 est. value
Mount Carmel, UT

Construction of the 1100 South and Highway 89A Realignment
Infrastructure
Post-Bid
Kanab, UT

Udot Region 4 Wash Rack Installation Various Locations
Term Contract, Infrastructure
Results

FY 2022 Pavement Maintenance Project
Infrastructure
Post-Bid
Kanab, UT

US-89 East Toadstools Passing Lane Extension Passing Lane
Infrastructure
Results
$3,000,000 to $4,000,000 est. value
UT

Last Updated 08/06/2022 01:31 AM
Project Title

Chip Seal 2022

Physical Address View project details and contacts
City, State (County) Kanab, UT 84741   (Kane County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $480,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: 195,500 yd2 of chip seal coat and related items. This will include approximately 5.38 miles of chip seal coat on the North Fork Road and then starting at the north end of Johnson Canyon Road working south as far as budget will allow, up to 6.77 miles to the Nephi Pasture road intersection. Bids will be received for quantities shown, but the actual award could be for a less amount based on where bids come in, in relation to the budget. A pre-bid conference will not be held. 5.38 miles of chip seal coat on the North Fork Road and then starting at the north end of Johnson Canyon Road Multiple Location Are Available In This Project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents