Similar Projects
SR 11 over East Branch Martins Creek
New Construction, Infrastructure
Conception
PA

SR 492 over Little Butler Creek
New Construction, Infrastructure
Conception
$500,000 est. value
New Milford, PA 18834

SR 167 over Hop Bottom Creek
New Construction
Design
$1,933,250 est. value
Montrose, PA 18801

SR 11 Shoulders / ELRS
Infrastructure
Bidding
$5,000,000 to $7,500,000 est. value
Hop Bottom, PA 18824

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Paving Project
Infrastructure
Post-Bid
Clifford, PA

Bradford to Rush
Results
$2,500,000 to $4,999,999 est. value
PA

Dirt and Gravel Petersen Road
Results
Dimock, PA 18801

Group 4-15-ST 4
Infrastructure
Conception
$500,000 est. value
Susquehanna, PA 18847

Susquehanna County Pavement Improvements Project
Infrastructure
Post-Bid
Montrose, PA 18801

2021 Road Improvement Project
Results

Pedestrian Bridge Construction Over Starrucca Creek
Infrastructure
Post-Bid
PA

Dirt and Gravel Roads Grant Project on Cabin Hill Road
Results
Less than $98,000 est. value
Montrose, PA

Major Bridge P3
New Construction
Post-Bid

Steel Pedestrian Bridge Superstructure
Results
$170,000 to $220,000 est. value
Clifford, PA

Last Updated 06/23/2022 02:44 PM
Project Title

SR 92 over Tributary Tunkhannock Creek

Physical Address View project details and contacts
City, State (County) South Gibson, PA 18842   (Susquehanna County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Dam/Tunnel, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected December 2024
Bids Due View project details and contacts
Estimated Value $1,137,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

usquehanna County, Gibson Township, State Route 92 Primary Improvement Type: Bridge Replacement As of June 22, 2022, the project is Future development stage. Anticipated letting date is October 05, 2023. PennDOT - SR 92 over Tributary Tunkhannock Creek *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Bridge, Demolition, Dam/Tunnel, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Shoring, Special Foundations and Load-Bearing Elements, Driven Piles, Tunneling and Mining, Tunnel Excavation.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents