Similar Projects
Building 587 Boiler Replacement
Term Contract
Bidding
$965,856 est. value
Salt Lake City, UT 84132

DFCM Construction-Pre Qualified Mechanical-SUU Heat Plant Steam PRV Bypass Replacement
Alteration
Bidding
$225,000 est. value
Cedar City, UT 84720

Mckinley Elementary School Boiler Replacement Project
Post-Bid
Tremonton, UT 84337

On-Call Task Order General Mechanical Construction Services
Term Contract
Post-Bid
Salt Lake City, UT 84114

H344--660 (Con) Engineering- Boiler 3Rd Party Inspection, Start-Up And Testing Services For 660-17-100 New Boiler Installation At The George E Wahlen Va Health Care System In Salt Lake City, Ut
Results
Salt Lake City, UT 84148

Canyon View Jr. Boiler Replacement
Results
Orem, UT 84097

Mountain Crest High School Mechanical Modifications
Term Contract
Bidding
Hyrum, UT 84319

2020 Dive and Splash Pools Boiler Replacement
Post-Bid
Kearns, UT 84118

Dfcm Construction-Pre Qualified Mechanical-Snow College Noyes Bldg. Chiller Replacement-21016700
Results
Less than $367,000 est. value
Ephraim, UT

2020 Replaster of the Outside Dive and Splash Pools
Post-Bid
Kearns, UT 84118

Removal of Existing Swimming Pool Boilers and Installation of New Boilers
Results
Less than $100,000 est. value
Lindon, UT 84042

Natural Gas Boilers
Post-Bid
Spanish Fork, UT

DFCM Construction-Pre Qualified Mechanical-W Jordan Courts Mechanical System and BAS-18251150
Results
Less than $3,000,000 est. value
West Jordan, UT 84088

South Davis Recreation District Roof and Mechanical Replacement
Post-Bid
Bountiful, UT 84010

Holladay Library Boiler Replacement
Results
Holladay, UT 84117

Last Updated 02/17/2022 02:35 AM
Project Title

Freedom Elementary Boiler Replacement

Physical Address View project details and contacts
City, State (County) Highland, UT 84003   (Utah County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide the boiler replacement at Freedom Elementary. Refer to the attached plans for a complete scope of work. Removal of existing boiler, pumps, buffer tank, heating expansion tank, gas piping and other related piping. Provision and installation of new boilers, new heating water supply and return, gas piping, flue, and expansion tank. Rewire existing emergency boiler shut-off. It is the intent that this construction shall start as soon as possible and be completed. The work to be done under this section includes the furnishing of all labor, materials, equipment, controls and accessories required to complete all systems as shown on plans and/or described in these specifications, including miscellaneous items required to provide a complete and functional facility.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents