Similar Projects
Millspring Village Subdivision
New Construction, Infrastructure
Conception
$44,000,000 CJ est. value
Greenville, SC 29617

Zoo Walkway Repaving - City of Greenville
Infrastructure
Conception
$366,500 CJ est. value
Greenville, SC 29601

The Alliance
New Construction, Infrastructure - 33,000 SF
Design
$15,000,000 CJ est. value
Greenville, SC 29607

Repave Basketball Court, Needmore Center
Infrastructure
Design
$32,000 CJ est. value
Greer, SC 29650

Reconstruction/Rehabilitation - Greenville Co
Infrastructure
Bidding
$2,000,000 CJ est. value
Taylors, SC 29687

Bridge Maintenance Greenville County
Infrastructure
Bidding
$500,000 CJ est. value
Simpsonville, SC 29680

Inland Port Greer, East and West Container Yard Expansion
Infrastructure
Post-Bid
$600,000 CJ est. value
Greer, SC 29651

SGFD Training Tower Foundation
Infrastructure
Post-Bid
Pelzer, SC 29669

Burger King Force Main Jack and Bore
Infrastructure
Results
Greenville, SC

Bethany Tank Water Supply Improvements
Infrastructure
Results
$995,379 CJ est. value
Laurens, SC 29360

BridgeWay Station Mixed-Use / Mauldin
New Construction, Infrastructure - 300,000 SF
Construction
$100,000,000 CJ est. value
Simpsonville, SC 29681

White Plains Warehouse
New Construction, Infrastructure - 408,000 SF
Construction
$44,000,000 CJ est. value
Piedmont, SC 29673

Parkers Summit Subdivision
New Construction, Infrastructure
Pending Verification
$66,000,000 CJ est. value
Greenville, SC 29601

Ford Street Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Greer, SC 29650

Laurens Road Swamp Rabbit Trail (SRT) - City of Greenville
Infrastructure
Conception
$1,500,000 est. value
Greenville, SC 29613

Last Updated 11/09/2022 12:12 PM
Project Title

Michelin Tire Manufacturing Facility Expansion

Physical Address View project details and contacts
City, State (County) Greenville, SC 29605   (Greenville County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $100,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements' to the tire-building facilities As of November 2022, Greenville county has no permits for improvements. The current status of the project has yet to be determined. December 2020 the owner announced the expansion of equipment and machinery; scope of work was not made public. County of Greenville has yet to issued permits for any improvements. Information regarding contact details for owner, architect, or contractor has yet to be determined. A firm timeline has yet to be announced. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents