Similar Projects
Oakland WWTP Sludge Thickening - 291091.00 0 - City of Topeka
Renovation
Conception
$3,598,000 est. value
Topeka, KS 66612

East Filters Rehabilitation Phase II - 281102.01 - City of Topeka
Renovation
Conception
$5,185,000 CJ est. value
Topeka, KS 66612

WTP2: Chemical Feed Modification - 5-C-026-20 - City of Olathe
Renovation, Infrastructure
Design
$2,390,000 CJ est. value
Lenexa, KS 66227

Kansas River WWTP - City of Lawrence
Renovation
Design
$70,000,000 CJ est. value
Lawrence, KS 66044

Water Treatment Plant Expansion Project - Phase II Rural Water District #2
Addition, Demolition, Infrastructure, Renovation
Bidding
$14,000,000 CJ est. value
Paola, KS 66071

6 Primary Sludge Pump Replacements
Renovation
Bidding
$50,000 CJ est. value
Topeka, KS 66616

Odor and Corrosion Control Services
New Construction
Post-Bid
Wichita, KS

Operation and Maintenance for Oakland RNG Pipeline
Renovation
Post-Bid
Topeka, KS

Defoamant - Kaw Point Treatment Plant
New Construction
Results
Kansas City, KS

Wastewater Treatment Plant Aeration Blower Replacement
Renovation
Results
Wamego, KS

City of Wichita Northwest Water Facility (NWWF)
Addition
Construction
$20,000,000 CJ est. value
Wichita, KS 67203

Lime Feed Building and Basin Modifications at Water Treatment Plant No. 2 / Olathe
Renovation
Pending Verification
$11,000,000 CJ est. value
Olathe, KS 66051

Hill's Pet Nutrition Expansion / Project Prince
New Construction, Infrastructure
Pending Verification
$31,400,000 CJ est. value
Topeka, KS 66617

Kaw WTP Infrastructure Rehab - MS-22-0032 - City of Lawrence
Renovation
Conception
$4,216,000 CJ est. value
Lawrence, KS 66044

Blue River WWTP Improvements - County of Johnson
Renovation
Design
$25,720,000 CJ est. value
Overland Park, KS 66221

Last Updated 01/23/2023 06:32 PM
Project Title

Water Treatment Plant Improvements

Physical Address View project details and contacts
City, State (County) Yates Center, KS 66783   (Woodson County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $578,500 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Custom BT Project #1 North Gallery Improvements - Walters-Morgan Construction Inc - 159,000 Project #2 South Gallery Improvements - Walters-Morgan Construction, Inc - 97,000 Project #3 Flocculator and Trough Improvements - Walters-Morgan Construction, Inc - 48,500 Project #4 Complete water tratment plant Improvements - Walters-Morgan Construction, Inc - $ 274,000 2060092800 The Project includes the following Work: Project #1: Work includes furnishing all the labor, materials, and equipment for installation of new butterfly valves with existing actuators, piping, and construction sequencing manual valves as indicated on the drawings for the North Gallery. Project #2: Work includes furnishing all the labor, materials, and equipment for installation of new butterfly valves with existing actuators and construction sequencing manual valves as indicated on the drawings for the South Gallery. Project #3: Work includes furnishing all the labor, materials, and equipment for installation of a new mud valve for the existing flocculator basin and replacement of the existing influent trough from the rapid mix basin to the flocculator basin. Project #4: Work includes furnishing all the labor, materials, and equipment for Projects #1, #2 and #3 in one mobilization. Alternate No. 1: Addition of lining the existing rapid mix basin, trough, flocculator basin and replacement of vertical baffles. The work shall include the coordination, labor, and equipment necessary along with all other incidental and appurtenant work required to complete this item. The Project has an expected duration of 210 days. Bidding Documents may be downloaded from the designated website. Prospective Bidders are urged to register with the designated website as a plan holder, even if Bidding Documents are obtained from a plan room or source other than the designated website in either electronic or paper format. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner norEngineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. The Issuing Office for the Bidding Documents is: Wilson & Company, Inc. Engineers & Architects 1700 E. Iron Ave, Salina, KS 67401 Telephone: 7858270433 Terri Basom; Email: planroom.salina@wilsonco.com Prospective Bidders may obtain or examine the Bidding Documents at the Issuing Office on Monday through Friday between the hours of 8 AM to 5 PM and may obtain copies of the Bidding Documents from the Issuing Office as described below. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office Bidding Documents may be purchased from the Issuing Office during the hours indicated above. Cost does not include shipping charges. Upon Issuing Office receipt of payment, printed Bidding Documents will be sent via the prospective Bidders delivery service. The shipping charge amount will depend on the shipping method chosen. Bidding Documents are available for purchase in the following format. Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. This Advertisement is issued by: WILSON & COMPANY, INC., ENGINEERS & ARCHITECTS Attn: Colton Woodard 1700 East Iron Avenue Salina, KS 67401 Email: colton.woodard@wilsonco.com Telephone: 7858202614 Any questions regarding the Bidding Documents should be directed at the Engineer at the above address.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents