Similar Projects
Purchase of Chopper Pumps
Infrastructure
Post-Bid
Gretna, LA

Improvements to Causeway Boulevard and Scott Street Sewer Lift Station
New Construction, Infrastructure
Post-Bid
Gretna, LA

Removal of Existing Vacuum Pumps and Furnish, Install and Startup of New Vacuum Pumps
Infrastructure
Results
Marrero, LA 70072

Vertical Turbine Solids Handling (VTSH) Pump and Motor
Infrastructure
Results
Gretna, LA

One Time Purchase of Sump Pumps for Jefferson Parish Public Works Warehouse
Alteration
Post-Bid
LA

Controller Pumps for Jefferson Parish Public Works Warehouse
Infrastructure
Results
Gretna, LA

Troubleshoot and Repair Thompson Pump Model 4HT for the Westbank Sewerage Lift Station
Infrastructure
Post-Bid
LA

One Time Purchase of Three Submersible Pumps and Control Panels for the Jefferson Parish Sewerage Department
Term Contract
Results
Gretna, LA

West Feliciana Parish Consolidated Waterworks District No 13
Alteration
Post-Bid

Purchase of Recirculation Pumps for the Jefferson Parish Westbank Warehouse
Infrastructure
Results
Gretna, LA

Bruce's Harbor Well Replacement
Infrastructure
Post-Bid

Install Two (2) New Submersible Grinder Pumps with Hose Elbow and Guide Rail Kit for the Jefferson Parish Recreation Department
Infrastructure
Results
Gretna, LA

Purchase of Two (2) Vortex Solids Handling Submersible Sewerage Pumps
Infrastructure
Post-Bid
LA

One Time Purchase of Six (6) Horizontal 6 Inch X 6 Inch Self Priming Non-Clog Centrifugal Sewage Pumps for the Jefferson Parish Department of Sewerage
Infrastructure
Results
Gretna, LA

High Lift Pump Room And Panola Pump Station Improvements
Infrastructure
Results
New Orleans, LA 70118

Reported 04/21/2022 10:35 AM
Project Title

Replace Flood Pumps

Physical Address View project details and contacts
City, State (County) Westwego, LA   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of repairs and/or replacement of existing storm water management system components. The existing system is primarily comprised of two 50 HP electric motors and two 16” pumps, with electric power control and backup systems housed in weatherproof boxes. Additional scope items include related electrical and piping as needed, a new concrete sump pump vault, area lighting, security fencing and signage, and repairs to or replacement of the existing 401 s.f. wood support platform with a new rain cover.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents