Similar Projects
Annual Full Depth Reclamation
Post-Bid
Southaven, MS

Clock Tower (Rebid)
New Construction, Infrastructure
Post-Bid
$2,034,805 CJ est. value
Winona, MS 38967

Mill, Overlay and Stripe Approximately 2 Miles on I-69 from the Concrete Section to Tennessee State Line
Results
MS

Intersection Improvements at Various Locations Throughout the District 6
Infrastructure
Results
MS

Industrial Park Access Road Improvements
Post-Bid
Belmont, MS

Weymouth Hall EWP Project - City of Natchez
Results
$150,098 est. value
Natchez, MS 39120

Old Foxworth Road Repair
Post-Bid
Columbia, MS 39429

Hot Mix Asphalt Overlay on Various Roads
Results
$3,145,212 est. value
Hernando, MS

2021 Street Overlay Summer
Post-Bid
Mississippi State, MS

Loyd Star Attendance Center Drainage and Grading Improvements
Results
$125,160 est. value
Wesson, MS 39191

Hardy Street Roundabout Project at 2nd Avenue/Green Street/Adeline Street
Post-Bid
$1,400,000 to $1,500,000 est. value
Hattiesburg, MS 39407

Road Widening
Results
$1,150,000 est. value
Hernando, MS

Grenada County Reclamation, Soil Cement, & D.B.S.T Roads "A" Thru "X"
Post-Bid
MS

Andrew Chapel Road Reconstruction
Results
$3,700,000 est. value
MS 22554

Asphalt Paving of Sweetgum Bottom Road
Post-Bid
Meridian, MS 39301

Last Updated 08/23/2022 11:05 AM
Project Title

Mill and Overlay of SR 5

Physical Address View project details and contacts
City, State (County) Ashland, MS 38603   (Benton County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $8,577,876 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Mill & Overlay approximately 15 miles of SR 5 from 1.4 miles south of Massengill Rd to 0.1 miles north of the old MDOT Maintenance Shop and approximately 1.3 miles of SR 370 from SR 5 to the east Ashland City Limits, known as State Project Nos. MP-2005-05(004) / 307511301 & MP-2370-05(001) / 307511302 in Benton County. For Federal Aid Projects the attention of bidders is directed to the contract provisions governing selection and employment of labor contained in the bid proposal. Minimum wage rates for Federal Aid Projects have been predetermined by the Secretary of Labor and are subject to Public Law 87-581, Work Hours Act of 1962, as set forth in the contract provisions. Unless otherwise set out in the bid proposal, all other projects are subject to the predetermined minimum wage rate set by the U.S. Department of Labor under the Fair Labor Standards Act. When a DBE goal is contained in the contract, the award will be contingent upon the Contractor satisfying the DBE requirements. Bid bond, signed or countersigned by a Mississippi Resident Agent or qualified non-resident agent, with Power of Attorney attached or on file with the Contract Administration Engineer of the Department, a Cashier's Check or Certified Check for five (5%) percent of bid, payable to State of Mississippi, must accompany each proposal. The attention of bidders is directed to the provisions of Subsection 102.07 pertaining to irregular proposals and rejection of bids. MSDOT - 06 - Mill and Overlay of SR 5

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents