Similar Projects
East Beach Bluff Stabilization
Infrastructure
Bidding
Port Jefferson, NY 11777

Stable Area Drainage Improvements
Infrastructure
Bidding
$99,450 to $134,550 est. value
Huntington, Lloyd Harbor, NY 11743

Shore Road Waterfront Park Natural Systems Resiliency Improvements
Post-Bid
Lindenhurst, NY 11757

Corrugated Polyethylene Drainage Pipe
Infrastructure
Post-Bid
Brookhaven, NY

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Governor`s Office of Storm Recovery Mastic Beach Drainage Improvements CR12 General Construction
Results
$2,025,000 to $2,406,000 est. value
Farmingville, NY 11738

Water Mains, Large Services and Appurtenances
Term Contract, Infrastructure
Bidding
NY

Annual Drainage Contract A, B and C
Term Contract
Post-Bid
East Hampton, NY

Cured-In-Place Pipelining - Term Construction Contract 7
Results

Cast Iron Drainage Items
Term Contract, Infrastructure
Post-Bid
Smithtown, NY

Drainage Improvements Albany Avenue Resurfacing
Infrastructure
Results
Lindenhurst, NY 11757

Precast Storm Drainage Structures and Reinforced Concrete Pipe
Term Contract
Post-Bid
Huntington, NY

Eric Estates Water Main and Appurtenances
Infrastructure
Results
Greenlawn, NY

Cement Lined Ductile Iron Pipe, Flanged
Term Contract
Post-Bid
NY

Lakeside Drive Roadway and Slope Stabilization
Infrastructure
Results
Huntington, NY 11721

Last Updated 12/02/2021 07:43 AM
Project Title

2021 Subaqueous Water Main Crossing - Shinnecock Canal at Meschutt Beach and Ponquogue Bridge at Lighthouse Road

Physical Address View project details and contacts
City, State (County) Hampton Bays, NY 11946   (Suffolk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The term of this Contract shall be from the date of execution of the Contract by the Supervisor or her designee until December 31, 2022, unless earlier terminated by the Town. Town of Southampton reserves the right to extend the Contract for up to two (2) additional one (1) year terms, if doing so would be in the best interest of the Town.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents