Similar Projects
Suffolk Avenue Commercial Building
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Brentwood, NY 11717

Suffolk Avenue Commercial Building
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Brentwood, NY 11717

205 Osborn
Demolition, New Construction, Infrastructure - 4,000 SF
Design
$14,000,000 CJ est. value
Riverhead, NY 11901

205 Osborn
Demolition, New Construction, Infrastructure - 4,000 SF
Design
$14,000,000 CJ est. value
Riverhead, NY 11901

Wooden Walkways & Beach Dune Crossovers
Renovation, Alteration
Post-Bid
Fire Island, NY

Wooden Walkways & Beach Dune Crossovers
Renovation, Alteration
Post-Bid
Fire Island, NY

Interchange from westbound I495 to Crooked Hill Rd
Infrastructure
Results
$32,500,000 est. value
Islip, Smithtown, NY

Concrete Pavement Restoration
Infrastructure
Results
$8,500,000 est. value
Babylon, Hempstead, Islip, Oyster Bay, NY

Beaver Dam Road Stormwater Management
Infrastructure
Construction
$419,878 CJ est. value
Brookhaven, NY 11752

Sunrise Highway Retail Building
Demolition, New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Bay Shore, NY 11706

Mattituck Hotel
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Mattituck, NY 11952

Concrete Pavement Repairs
Infrastructure
Conception
$9,900,000 CJ est. value
Babylon, NY 11702

Southampton Hospital ER Facility - Pantigo Place
New Construction, Infrastructure - 27,700 SF
Design
$38,000,000 CJ est. value
East Hampton, NY 11937

Design Build Services for LIRR ADA Stations Improvements Package 1
Term Contract
Post-Bid
$90,000,000 to $110,000,000 est. value
Amityville, Copiague, Lindenhurst, Massapequa Park, Valley Stream, NY

Priority Surface Treatment
Infrastructure
Results
$39,100,000 est. value
Brookhaven, Islip, NY

Last Updated 07/18/2023 10:14 AM
Project Title

Partial Parking Lot Reconstruction at J. Taylor Finley Middle School

Physical Address View project details and contacts
City, State (County) Huntington, NY 11743   (Suffolk County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $189,500 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Parking Lot Reconstruction at J.Taylor Finley Middle School Partial replacement of existing, parking lot paving system; includes concrete curbs, walks, retaining wall and drainage work. The Contract Documents may be examined at the Office of the Architect, BBS Architects, Landscape Architects and Engineers, P.C., 244 East Main Street, Patchogue New York, (631-475-0349); Checks for deposits shall be made payable to the District, HUNTINGTON UNION FREE SCHOOL DISTRICT, and may be uncertified. All bid addenda will be transmitted to registered plan holders via email and will be available at the above referenced website. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. Plan holders who have obtained hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use, and coordinate directly with the printer for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies of the bid addenda. The bid deposit for hard copies will be returned upon receipt of plans and specifications, in good condition, within thirty days after bid date, except for the lowest responsible bidder, whose check will be forfeited upon the award of the contract. The Contract will be awarded to the lowest responsible bidder or the proposals will be rejected within 45 days of the date of opening proposals. Bids shall be subject, however, to the discretionary right reserved by the School District to waive any informalities in, accept or reject any alternatives, reject any proposals and to advertise for new proposals, if in its opinion the best interest of the School District will thereby be promoted. Each bidder may not withdraw his bid within 45 days after the formal opening thereof. A bidder may withdraw his bid only in writing and prior to the bid opening date.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents