Similar Projects
Key Tower Apartment Conversion
New Construction, Renovation
Conception
$4,000,000 est. value
Tacoma, WA 98402

Summit Centre Office Warehouse
New Construction - 79,576 SF
Design
Puyallup, WA 98373

Tacoma Financial Center Improvements
Renovation - 200,000 SF
Design
Tacoma, WA 98402

Potable Water Line Replacement - Clover Park Technical College
Infrastructure
Bidding
$865,000 CJ est. value
Lakewood, WA 98499

Chambers Creek Road / Chambers Lane Phase 1
Infrastructure
Bidding
$200,000 CJ est. value
University Place, WA 98467

VA American Lake Phase 2 Site Development
Demolition, Term Contract, Infrastructure, Alteration
Post-Bid
$10,000,000 to $25,000,000 est. value
Tacoma, WA

Parking / Pedestrian Site Lighting and Stormwater Management Items For Vaal Ph 2A At Jblm, Wa
Infrastructure
Post-Bid
Lakewood, WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

Generator Relocation and Contaminated Soil Cleanup
Infrastructure, Alteration
Results
$350,000 est. value
Tacoma, WA 98402

Builders Capital's Headquarters
Addition - 20,320 SF
Pending Verification
Puyallup, WA 98374

Tacoma Town Center Buildings 1, 5 and 6
New Construction - 219,000 SF
Design
$80,000,000 est. value
Tacoma, WA 98402

Parcel 15 (Portac) Cleanup Phase 1
Infrastructure
Bidding
$2,380,000 CJ est. value
Tacoma, WA 98421

Installation of Concrete Slab Construction of A Steel Building
New Construction, Infrastructure
Post-Bid
$20,000 est. value
Lakewood, WA

.67 Acre Site Development and Infrastructure
Infrastructure
Results
Tacoma, WA

Burnham Drive Apartments
New Construction, Infrastructure
Design
$30,000,000 est. value
Gig Harbor, WA 98332

Last Updated 07/25/2022 11:32 AM
Project Title

East Pierce Fire and Rescue (EPFR) Fire Station 111

Physical Address View project details and contacts
City, State (County) Bonney Lake, WA 98391   (Pierce County)
Category(s) Commercial, Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Office, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $18,950,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

** This project has been awarded to Jones & Roberts Co. in the amount of $18,950,000. ** The contract includes general trades, mechanical, electrical, and related site work for a new two-story fire station of primary wood frame with steel and concrete elements. Station will include fire apparatus parking area with supporting functions. Living and sleeping quarters for 24 hour use by fire department personnel. Administrative headquarter also occupies level 1 of the building. Station is approximately 36,000 square feet in total. Base bid cost range of $14,800,000 to $16,630,000 not including sales tax. This project is subject to meet Washington State prevailing wages rates. All work performed on the project will be subject to the approved wage determination rates in the bid documents. Equal Opportunity/Affirmative Action: Owner is an equal opportunity and affirmative action employer. Minority-owned and women-owned businesses are encouraged to submit bids. The conference is intended to provide a general review between bidders, owner and architect prior to the bidding of the project. In order to take precautions due to the Covid 19 virus, face masks and social distancing rules will be observed. A Bid Security must accompany each bid in accordance with the Instructions to Bidders. The owner reserves the right to reject any or all bids, waive minor irregularities in the bidding process, and to accept the bid deemed best for them. All questions must be submitted in writing to Rice Fergus Miller, Inc., 275 5th Street, Bremerton, WA 98337, Attention Hiroshi Inoue, hinoue@rfmarch.com; Phone: 360-377-8773. Substitution Requests: Architect will consider requests for substitution received no later than ten working days prior to receipt of Bids. Requests received after that time may be considered or rejected at the discretion of the Architect. The successful bidder shall enter into a contract in accordance with the bid and shall furnish a Performance Bond, separate Labor & Material Payment Bond in the amount of 100% of the bid amount, and insurance. All bid proposals shall be deemed to be offers to enter into a contract and shall be irrevocable for a period of thirty (30) days from the date of the opening of the bids.

Details

36,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents