Similar Projects
STEM Building B - Seminole State College
New Construction, Infrastructure - 111,775 SF
Conception
$48,564,418 CJ est. value
Altamonte Springs, FL 32714

3000 Celery
New Construction, Infrastructure
Conception
$5,000,000 est. value
Sanford, FL 32771

I-4 Industrial Park Lot 7 - Office/Warehouse
New Construction - 21,200 SF
Design
$1,000,000 est. value
Sanford, FL

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Supplemental Routine Maintenance - Deland Operations and Oviedo Operations
Infrastructure
Post-Bid
DeLand, Oviedo, FL

Seminole Fire Station No. 39
New Construction, Infrastructure - 12,920 SF
Post-Bid
$8,000,000 CJ est. value
Sanford, FL 32771

Seminole County Fire Station Asphalt Replacement
Results
Geneva, Winter Park, FL 32732

Fire Hydrant Maintenance, Repair and Replacement Services
Results
Sanford, FL

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Chipotle - Phase 1 - Sitework
Demolition, Infrastructure, Alteration
Construction
Casselberry, FL 32707

Kentucky Square
New Construction, Infrastructure
Pending Verification
$58,300,000 CJ est. value
Sanford, FL 32773

Kentucky Square
New Construction, Infrastructure
Pending Verification
$58,300,000 CJ est. value
Sanford, FL 32773

Broadstone Retail Development
New Construction, Infrastructure
Conception
$4,000,000 CJ est. value
Sanford, FL 32771

Last Updated 12/02/2022 06:38 AM
Project Title

Resurfacing/Lighting/Drainage Improvements/Pedestrian Signals

Physical Address View project details and contacts
City, State (County) Altamonte Springs, FL 32701   (Seminole County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $13,994,513 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Counties: SEMINOLE Road Name: SR 436 Limits: FROM NORTHLAKE BLVD/CRANES ROOST BLVD E TO BOSTON AVE Project(s): 44114015201(*) Federal Aid No: D521097B Project(s): 44114015202 Federal Aid No: D521097B Total Roadway Length: 0.826 Miles Contract Days: 390 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.826 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 60 Calendar Days The improvements under this contract consist of milling and resurfacing, curb & gutter, drainage improvements, sidewalk, ADA improvements, pedestrian signal upgrades, signing and pavement markings, and utility relocations along SR 436. Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Department's budget. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 009 - Resurfacing/Lighting/Drainage Improvements/Pedestrian Signals Questions posted to this site before 5:00 P.M. (EST) on the seventh calendar day prior to the bid opening, or tenth calendar day prior to the December bid opening, will be responded to by the Department. For questions posted after these times, an answer cannot be assured. For all questions posted before the deadline, the Department will provide and post responses at the same website before 8:00 A.M. (EST) on the second calendar day prior to bid opening

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents