Similar Projects
Provide and Replace Inverter and Protection Batteries at Lake Hodges Pumped Storage and Hydroelectric Facility
Alteration
Design
$200,000 est. value
San Diego, CA 92101

Install Eaton UPS on Chiller
Renovation
Sub-Bidding
$100,000 CJ est. value
San Diego, CA 92161

Imperial Avenue Generator Upgrade Construction
Infrastructure
Sub-Bidding
$493,327 CJ est. value
San Diego, CA 92101

CHP San Diego Area office - Generator Maintenance Services
Term Contract
Post-Bid
San Diego, CA 92123

Solar System Preventative Maintenance, Monitoring and Repairs
Alteration
Post-Bid
San Diego, CA 92037

Place Minor Concrete, Replace Irrigation and Electrical Facilities
Alteration
Results
$5,400,000 est. value
CA

Kensington Heights 2 Series Circuit Upgrade
Infrastructure
Results
$1,630,000 est. value
San Diego, CA 92116

RFP - Construction Management Services for Construction of the Programmable Logic Controller (PLC) Replacement Project
Renovation
Sub-Bidding
$150,000 CJ est. value
San Diego, CA 92101

Replace Primary Substation, Transformer and Dual Primary Selective Switches
Renovation
Post-Bid
$20,000,000 CJ est. value
San Diego, CA 92161

Installation of Lead Pedestrian Interval Traffic Signal Operations
Infrastructure
Results
$1,345,924 CJ est. value
Chula Vista, CA 91910

Traffic Signal Upgrade at Five Locations
Infrastructure
Sub-Bidding
$1,150,000 CJ est. value
San Diego, CA 92101

Citywide Street Lights Groups 1701 and 1702
Infrastructure
Post-Bid
$810,245 CJ est. value
San Diego, CA 92101

Job Order Contract - Fire Protection and Electrical Contractor
Term Contract
Results
San Diego, CA

FHS Cafeteria Electrical Upgrades
Renovation
Sub-Bidding
$200,000 CJ est. value
Fallbrook, CA 92028

Nierenberg Switchgear Replacement
Alteration
Post-Bid
$616,000 est. value
San Diego, CA 92037

Last Updated 09/05/2023 10:36 AM
Project Title

Street Lighting Replacement Program - Phase 2

Physical Address View project details and contacts
City, State (County) Carlsbad, CA 92008   (San Diego County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $767,012 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Submission of the electronic bid into the system may not be instantaneous. Due to the speed and capabilities of the users internet service provider (ISP), bandwidth, computer hardware and other variables, it may take time for the bidders submission to upload and be received by the Citys Bidding system. It is the bidders sole responsibility to ensure their bids are received on time by the Citys Bidding system. The City of Carlsbad is not responsible for bids that do not arrive by the Due Date and Time. The City of Carlsbad reserves the right to reject any or all bids and to waive any minor irregularity or informality in such bids Except as provided herein a bid submitted to the City by a Contractor who is not licensed as acontractor pursuant to the Business and Professions Code shall be considered nonresponsive and shall be rejected by the City. In all contracts where federal funds are involved, no bid submitted shall be invalidated by the failure of the bidder to be licensed in accordance with Californialaw. Where federal funds are involved the contractor shall be properly licensed at the time the contract is awarded. In all other cases the contractor shall state their license number, expirationdate and classification in the proposal, under penalty of perjury. This invitation to bid does notinvolve federal funds. The following classifications are acceptable for this contract: C-10, General Electrical. Pursuant to the California Labor Code, the director of the Department of Industrial Relations has determined the general prevailing rate of per diem wages in accordance with California Labor Code, section 1773 and a copy of a schedule of said general prevailing wage rates is on file in the office of the City Engineer and is incorporated by reference herein. Pursuant to California Labor Code, section 1775, Contractor shall pay prevailing wages. Contractor shall post copies of all applicable prevailing wages on the job site. Contractor shall comply with California Labor Code, section 1776, which generally requires keeping accurate payroll records, verifying and certifying payroll records, and making them available for inspection. Contractor shall require all subcontractors to comply with Section 1776.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents