Similar Projects
T-Hangar Area Development Duplin County Airport
Results
Kenansville, NC

P199 Design-Build Aircraft Maintenance Hangar and P235 Design-Bid-Build Flightline Utility Modernization, Marine Corps Air Station, Cherry Point, North Carolina
Construction
$100,000,000 to $250,000,000 est. value
Cherry Point, Havelock, NC 28532

North Ramp Hangar N1
Construction
Hickory, NC 28601

Michael J Smith Airport Hurricane Repairs
Post-Bid
NC 28570

T-Hangar and Taxilane Development
Results
North Wilkesboro, NC 28659

Industrial Airpark Construction - Hangar Complex
Results
Less than $165,930 est. value
Kenansville, NC

Beaufort Airport Siding Repair Project
Post-Bid
Beaufort, NC

T-Hangar and Taxilane Design
Results
North Wilkesboro, NC 28659

Design-Build for Smith Reynolds Airport Quonset Hangar Renovations
Renovation
Post-Bid
Winston-Salem, NC 27105

Schedule 1 - New Corporate Hangar and Schedule 2 - Site Work and Utility Improvements
Results
Roxboro, NC 27573

P197 DB Aircraft Maintenance Hangar, MCAS Cherry Point, NC
New Construction
Design
$100,000,000 to $250,000,000 est. value
Cherry Point, NC

145th AW Add/Alter Small Air Terminal
Addition - 15,700 SF
Post-Bid
$5,000,000 to $10,000,000 est. value
Charlotte, NC

Johnson Regional Airport Hangar and Office Space
New Construction
Post-Bid
Smithfield, NC

Last Updated 12/18/2020 09:18 AM
Project Title

Design-Build for Smith Reynolds Airport New Corporate Hangar Project

Physical Address View project details and contacts
City, State (County) Winston-Salem, NC 27105   (Forsyth County)
Category(s) Transportation
Sub-Category(s) Aircraft Hangar
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Providing professional design and construction services for the Smith Reynolds Airport New Corporate Hangar Project. Demolishing two facilities and constructing two new 20,000 square foot corporate hangars adjacent to the Terminal Building. The project is to include the hangars and ramp improvements. The lead Design-Builder will be expected to provide concurrent design and construction turnkey activities for this project resulting in a finished, fully usable facility that satisfies all project requirements and contract terms. The Design-Builder, as the sole responsible source for total project compliance and construction related performance (including architectural programming, design, and construction services) will hold all design professionals, testing services (with the exception of Special Inspections by Owner), trade contractors and trade supplier contracts.

Details

Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents