Last Updated 09/11/2020 02:15 PM
Project Title

Reconstruction/Preservation - District 2

Physical Address View project details and contacts
City, State (County) SC   (Abbeville County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds and Insurance 1.000 Ls Construction Stakes, Lines & Grades 4.000 Ea Traffic Control 1.000 Ls Railroad Insurance and Flagging 001 1.000 Ls Removal & Disposal of Existing Pavement 325.000 Sy Borrow Excavation 4,652.000 Cy Cement Modified Recycled Base (10" Unif)-curing Method B 128,413.000 Sy Cement Modified Recycled Base (12" Unif)-curing Method B 12,730.000 Sy Portland Cement for Cement Modified Recycled Base Course 5,313.000 Ton Maintenance Stone 74.900 Ton Liquid Asphalt Binder Pg64-22 1,545.528 Ton Full Depth Asph. Pav. Patching 4" Unif. 100.000 Sy Full Depth Asph. Pav. Patching 8" Unif 7,260.000 Sy Full Depth Asph. Pav. Patching 10"Unif 130.000 Sy Milling Existing Asphalt Pavement 1.5" 12,381.000 Sy Milling Existing Asphalt Pavement 1.75" 13,085.000 Sy Milling Existing Asphalt Pavement 2.0" 116,850.000 Sy Milling Existing Asphalt Pavement (Variable) 8,805.000 Sy Milled-in Rumble Strip 11.120 Mi Hot Mix Asphalt Surface Course Type B 10,692.774 Ton Hot Mix Asphalt Surface Course Type C 15,522.809 Ton Driveway Paving-surface Type B 43.750 Ton Driveway Paving-surface Type C 752.063 Ton Permanent Construction Signs (Ground Mounted) 3,936.000 Sf 4" White Broken Lines -(Gaps Excluded)-fast Dry Paint 14,470.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-fast Dry Paint 490,230.000 Lf 6" White Solid Lines (Pvt. Edge Lines)-fast Dry Paint 612.000 Lf 8"White Solid Lines(Crosswalk&channelization)fast Dry Paint 8,664.000 Lf 24" White Solid Lines (Stop/diagonal Lines)-fast Dry Paint 14,422.000 Lf White Single Arrow (Left, Straight, Right)-fast Dry Paint 113.000 Ea White Word Message "Only"-fast Dry Paint 31.000 Ea White Combination Arrow(Str.& Rt.or Str.& Lt.)fast Dry Paint 32.000 Ea Railroad Crossing Symbols - Fast Dry Paint 15.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 18,100.000 Lf 4"Yellow Solid Line(Pvt.edge&no Passing Zone)-fast Dry Paint 566,177.000 Lf 6" Yellow Solid Line on Curb/median - Fast Dry Paint 1,705.000 Lf 4" White Broken Lines(Gaps Excl.)thermoplastic- 90 Mil. 4,645.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 128,040.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 204.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 2,888.000 Lf 24" White Solid Lines (Stop/diag Lines)-thermo.-125 Mil 1,139.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 37.000 Ea White Word Message "Only" -thermoplastic - 125 Mil. 9.000 Ea White Combination Arrows(Str&rt.or Str<)thermo-125mil 10.000 Ea Railroad Crossing Symbols - Thermoplastic - 125 Mil. 5.000 Ea 4" Yellow Broken Lines(Gaps Exc)thermoplastic - 90 Mil. 4,750.000 Lf 4" Yellow Solid Lines(Pvt.edge Lines) Thermo-90 Mil. 156,742.000 Lf 6" Yellow Solid Lines(Pvt.edge Lines) Thermo-90 Mil. 120.000 Lf Permanent Clear Pavement Markers- Mono-dir.- 4"X4" 231.000 Ea Permanent Yellow Pavement Markers Mono-dir.- 4"X 4" Perm. Yel. 244.000 Ea Permanent Yellow Pavement Markers Bi-dir.- 4"X4" 1,248.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 755.000 Lf Furnish & Instl No. 14 Copper Wire,1-conductor for Loop Wire 18,786.000 Lf Sawcut for Loop Detector 2,356.000 Lf 13"X24"X12"D.elec.flush Undgrd.enclosure-(Str.poly.conc.)hd 19.000 Ea Catch Basin -type 9 1.000 Ea Adjust Manhole 6.000 Ea Concrete Curb and Gutter(1`-6") Vertical Face 80.000 Lf Detectable Warning Material 162.500 Sf Concrete Driveway(6" Uniform) 45.000 Sy Pedestrian Ramp Construction 325.000 Sy Surface Applied Detectable Warning 390.000 Sf Remove & Dispose Semi-rigid Gr Device 250.000 Lf Premash W-beam Strong Post System Wsp3 390.000 Lf Mt3 Leading End Treatment Tl3 36.000 Ea Premash Reset W-beam Strong Post System 37.500 Lf Mgs3 Gr Standard Shoulder 137.500 Lf Mgs3cs Gr Compressed Shoulder 2,275.000 Lf Premash W-beam Compressed Shldr 9` Post 550.000 Lf Premash Type T Tl3 Leading 50` 9.000 Ea Permanent Grassing for Non-permitted Resurfacing Projects 11.795 Acre Sediment Tubes for Ditch Checks 70.000 Lf Silt Fence 1,650.000 Lf Replace/repair Silt Fence 170.000 Lf Removal of Silt Retained by Silt Fence 415.000 Lf

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents