Similar Projects
Signing and Delineation - Gravel Roads
Infrastructure
Conception
$1,477,000 CJ est. value
Mc Intosh, SD 57641

AC Surfacing, Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$9,194,000 CJ est. value
Watauga, SD 57660

SD63 - Fm the Us212 E Jct to N of the Moreau River
Infrastructure
Design
$14,249,000 CJ est. value
Trail City, SD 57657

SD63 - Fm the Us212 E Jct to N of the Moreau River
Infrastructure
Design
$14,249,000 CJ est. value
Trail City, SD 57657

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Standing Rock Sioux Tribe Ambulance Base
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
McLaughlin, SD 57642

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Cold Milling Asphalt Concrete, Asphalt Concrete Resurfacing (90K ton) and Pipe work
Infrastructure
Results

Mill, AC Resurfacing, Pipe Work - SD 1806
Infrastructure
Conception
$5,017,000 CJ est. value
Wakpala, SD 57658

Grading, Interim Surfacing, Replace Str Bridge
Infrastructure
Design
$16,715,000 CJ est. value
Watauga, SD 57660

Cold Milling, Asphalt Concrete, Asphalt Concrete Resurfacing (31K Tons), Pipe Work and ROW Plans
Infrastructure
Results

Asphalt Surface Treatment
Infrastructure
Results

Rout and Seal
Infrastructure
Results
$80,000 est. value
SD

Last Updated 03/21/2023 07:42 AM
Project Title

Signals, Sidewalk, CE

Physical Address View project details and contacts
City, State (County) McLaughlin, SD 57642   (Corson County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $275,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SD63 - In McLaughlin, BNSF RR, DOT #393919S. As of March 21, 2023, the project is in Final Planning status. Anticipated Construction year is 2023. SDDOT - Signals, Sidewalk, CE *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents