Similar Projects
Fall Protection System Improvements
New Construction, Infrastructure, Alteration
Bidding
$800,000 est. value
Greensboro, NC

Winding Pine Pump Station
New Construction
Bidding
$5,000,000 est. value
Cary, NC

Magnolia Greens Lift Station #1 Relocation
Post-Bid
Leland, NC 28451

On-Call Corrective Maintenance and Repair Service
Term Contract
Post-Bid
Charlotte, NC

Snow Hill Road Pump Station and Force Main Replacement
New Construction
Results
Less than $1,899,449 est. value
Durham, NC 27701

OMC Pump Station and Water Treatment Plant Improvements
Results
Less than $1,000,000 est. value
Burnsville, NC 28714

Githens School Lift Station and Force Main
New Construction, Infrastructure
Bidding
$4,000,000 to $5,000,000 est. value
Durham, NC 27704

Sewer Pump Station No. 1 Improvements
Post-Bid
Walnut Creek, NC 27534

Groometown Road Water Booster Station
Results
Greensboro, NC

Wastewater Treatment Plant and Lift Stations Improvements
Renovation
Bidding
$1,100,000 est. value
Pilot Mountain, NC 27041

Poplin Road Pump Station Interim Improvements - Design Build Contract
Post-Bid
Monroe, NC 28112

Pump Repair at Idols Pump Station
Results
Winston-Salem, NC 27101

Progressive Design-Build Services for the Clarke Creek Pumping Station and Force Main Project
New Construction, Infrastructure
Bidding
Charlotte, NC

Public Safety Building Lift Station
Post-Bid
Atlantic Beach, NC

Raw Water Pump Station Improvements
Results
Troy, NC 27371

Last Updated 11/10/2021 10:12 AM
Project Title

Beaver Creek Pump Station Bar Screen and Odor Control Improvements

Physical Address View project details and contacts
City, State (County) Cary, NC 27513   (Wake County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing and installation of a new mechanical bar screen no. 2 at the Beaver Creek pump station, inclusive of a new conveyor no. 2 and associated appurtenances. In addition, existing conveyor, compactor and washer at existing mechanical bar screen no. 1 is to be demolished and replaced with a new conveyor no. 1. Improvements to the existing odor control system and miscellaneous site improvements are also included in the scope of work.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents