Similar Projects
Intersection Improvement With Added Lanes - SR 15
Infrastructure
Bidding
Fort Wayne, IN

Johnny Appleseed Campground Improvements
Infrastructure
Bidding
$550,000 est. value
Fort Wayne, IN 46805

Lincoln Highway Improvements
Post-Bid
New Haven, IN 46774

2021 Street Package
Infrastructure
Post-Bid
New Haven, IN

Alley Reconstruction
Results
Fort Wayne, IN 46802

2021 New Haven High School Track Resurfacing
Results
New Haven, IN 46774

Brick Alley R00831 North-South: West Taber Street, West Suttenfield Street , Webster Street, Hoagland Avenue
Infrastructure
Bidding
$7,289,000 est. value
Fort Wayne, IN

2021 Pavement and Site Improvements
Infrastructure
Post-Bid
Fort Wayne, IN

2020 Resurfacing Package Northeast
Results
Fort Wayne, IN

Concrete Pavement Restoration (CPR)
Infrastructure
Bidding
$2,037,864 est. value
New Haven, IN 46774

Concrete Pavement Restoration and Replace Superstructure
Infrastructure
Post-Bid
Bloomington, IN 47404

Dunton Road Improvements
Results
Less than $1,000,000 est. value
Fort Wayne, IN

Asphalt Resurface
Infrastructure
Post-Bid
IN

Coldwater Road Greenscape - Cook Road to Till Road
Results
Fort Wayne, IN 46800

Asphalt Cut Repair Services
Infrastructure
Post-Bid
Fort Wayne, IN

Reported 07/15/2022 10:58 AM
Project Title

Shift or Reconfigure Existing Taxiway - Fort Wayne Allen County Airport Authority

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46825   (Allen County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Seeking Funding
Bids Due View project details and contacts
Estimated Value $895,148 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not been identified. As of July 14, 2022, the U.S. Department of Transportation’s Federal Aviation Administration awarded $518?million to Improve Critical Airport Infrastructure. Further details regarding design and construction timelines have not been identified. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents