Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Electrical Supplies
Term Contract
Sub-Bidding
Houston, TX 77002

EMG Thruster
Term Contract
Sub-Bidding
Houston, TX 77002

Renovate Rear Gate
Alteration
Post-Bid
Houston, TX 77002

Houston District Quarterly and Annual Generator Maintenance
Term Contract, Alteration
Post-Bid
Houston, TX

Maintenance, Repair, and Testing of Emergency Power Units for Various Departments
Results
$6,292,327 est. value
Houston, TX 77251

Generator Replacement at Avenue D Water Plant
Results
$250,000 est. value
Channelview, TX 77530

Oculus LED Display System Provider for Houston Airport System (HAS)
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Houston, TX 77032

Electrical Maintenance and Repairs
Alteration
Post-Bid
Houston, TX

Electrical Services for Water and Wastewater Treatment Plant and Lift Stations
Term Contract, Alteration
Results
La Porte, TX

Houston Gessner Generator
Renovation
Sub-Bidding
$300,000 CJ est. value
Houston, TX 77071

Bayport Facility Back Up Electrical Power Services
Alteration
Post-Bid
Pasadena, TX 77507

Greenbelt Park Trail Lighting Replacement
Alteration
Results
TX 77059

Network and Wireless Electronics for New Campuses
Term Contract
Sub-Bidding
Katy, TX 77493

Water Plant Number 1 Generator Addition
Alteration
Post-Bid
TX

Last Updated 01/19/2023 05:20 PM
Project Title

Proposed Emergency Generators and Rehabilitation of Lift Stations 1, 2, and 3

Physical Address View project details and contacts
City, State (County) Houston, TX 77002   (Harris County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,354,349 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For furnishing all labor, material, and equipment necessary for the construction of the project known as Proposed Emergency Generators and Rehabilitation of Lift Stations 1, 2, & 3. The project is located at 3609 1/2 S. Sam Houston Parkway E., 4030 1/2 Brunswick Crossing Lane, and 14041 1/2 Sandstone Bend Drive, all of which are located within the boundary of the District in Harris County. Major items of work in the project include Providing and installing natural gas generators at each site, rehabilitation of the wet wells, and replacement of piping and electrical components All bids must be submitted with a Bid Bond, signed by the surety and the Bidder, a Cashiers Check or Certified Check in an amount equal to five percent (5%) of the total bid. The Owner reserves the right to reject any or all bids or to waive any informalities or minor defects in bidding and accept any bid deemed advantageous to the Owner. No bid may be withdrawn within sixty (60) days following the bid opening. All bids received after the date and time of the bid opening as described above will be rejected and returned to the Bidder unopened. The successful Bidder will be required to provide bonds in the amount of one hundred percent (100%) of the contract price. Pursuant to Texas Government Code 2252.908 and the rules promulgated thereunder by the Texas Ethics Commission (TEC), the Owner may not formally accept a bid until it has received a completed TEC Form 1295 complete with notarized signature and a Certificate of Filing number assigned by the TEC. To complete and submit TEC Form 1295 and generate the Certificate of Filing, please visit the Texas Ethics Commission website electronically Any questions should be directed to the Engineer, Matthew D. Kelley, P.E., or by email at MDK@MK-ENGR.COM. The deadline to ask questions is 12/12/2022 2:00 PM CST The Contractor hereby agrees to begin work within ten (10) calendar days after written Notice to Proceed has been given by Engineer. Contractor hereby also agrees to achieve Substantial Completion of the Work within 210 calendar days after the day of the written Notice to Proceed and to achieve Final Completion of the Work within 270 calendar days after the date of the written Notice to Proceed

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents