Similar Projects
Construction of the Chip Seal Program Fiscal Year 2020/2021 and 2021/2022 Project
Bidding
Prescott Valley, AZ

SR 69 Frontage Road Pavement Overlay Project
Bidding
$390,000 est. value
Prescott Valley, AZ

Pavement Preservation
Post-Bid
Cottonwood, AZ 86236

AZ FTFS 104(1) Mingus Mountain
Post-Bid
$400,000 to $1,000,000 est. value
AZ 86326

Page Springs Road Seal Coat
Results
Less than $195,000 est. value
Prescott, AZ

TOPV IGA Roadway Improvement Projects
Results
Prescott, Prescott Valley, AZ 86314

Road 2 North Paving Improvements Project
Bidding
$800,000 est. value
Chino Valley, AZ

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

System Enhancement-Other Enhancements
Results

Design-Build Services for Verde Connect Road, SR 260 to Cornville Road
Post-Bid
Prescott, AZ 86305

Viewpoint Drive Connector
Results
Prescott Valley, AZ 86314

Chip Seal Summer FY 2020-2021
Post-Bid
$1,012,400 est. value
Prescott, AZ

Verde Valley School Road Overlay
Results
$562,200 est. value
Prescott, AZ 96305

Supply or Supply and Deliver Hot Asphaltic Concrete
Post-Bid
Prescott, AZ

2019-2020 Chip Seal
Results
Less than $947,300 est. value
Prescott, AZ

Last Updated 02/03/2020 03:38 PM
Project Title

Y--Badger Springs Recreation Site Roads

Physical Address View project details and contacts
City, State (County) Black Canyon City, AZ 85324   (Yavapai County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000 to $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will include road improvements for the site roads and 5 parking lots for Badger Springs rec site. Site road and parking lots are gravel roads and will be graded and compacted. Aggregate base will need to be placed on gravel loss areas as this has occurred and will need to be covered and compacted. Site road is approximately 18,693 SY and the 5 parking lots are a total of approximately 7,426 SY for a total of 26,119 SY. Slope road and ditches to ensure proper drainage.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents