Similar Projects
Angry Birds Mini Golf
Build-Out
Conception
East Rutherford, NJ 07073

14-16 Burma Jersey City Film Studio
Renovation - 110,308 SF
Conception
Jersey City, NJ 07305

Entertainment Complex
Renovation
Design
$3,000,000 est. value
Rio Grande, NJ 08242

Adult Daycare Facility
Renovation, Addition - 11,695 SF
Design
Iselin, NJ 08830

Central Park Field House Project Phase II
Post-Bid
Orange, NJ 07050

Covered Shooting Ranges, Millville Wildlife Management Area
Post-Bid
$687,606 est. value
Millville, NJ

River Vale Country Club Miniature Golf Course & Administration Building
- 400 SF
Results
River Vale, NJ 07675

Cottrell Farm Park Building Rehabilitation Phase I
Renovation
Results
Old Bridge, NJ 08857

Hollydell North Ice Rink
Renovation, Addition
Construction
$5,000,000 est. value
Sewell, NJ 08080

Affordable Housing Studio Apartments
New Construction, Demolition - 5,036 SF
Pending Verification
Less than $500,000 CJ est. value
Jersey City, NJ 07306

150 Theodore Jersey City Film Studio
Renovation - 70,569 SF
Conception
Jersey City, NJ 07305

K-9 Resorts
New Construction, Renovation, Addition - 16,818 SF
Design
Hillsborough, NJ 08844

Contractor Services Shooting Range Remediation
Post-Bid
Wanaque, NJ 07465

Merritt Field Fieldhouse
Results
Cresskill, NJ 07626

Pier Six
New Construction - 139,990 SF
Conception
$10,000,000 CJ est. value
Jersey City, NJ 07310

Last Updated 06/02/2020 09:00 AM
Project Title

Lambert Castle and Carriage House Restoration and Rehabilitation

Physical Address View project details and contacts
City, State (County) Paterson, NJ 07503   (Passaic County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes rehabilitation of the exterior and interior of Lambert Castle, repairs and modifications to the mechanical system, and replacement of the roof and windows. The interior work shall include restoration of the existing finishes, replacement restroom fixtures and finishes and the installation of historically appropriate LED light fixtures

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents