Similar Projects
Bit Mill and Overlay
Alteration
Conception
$8,800,000 est. value
Wabasha, MN 55981

Lewiston Road Upgrade/Maintenance
Renovation, Term Contract
Post-Bid
Lewiston, MN

North Smoky Hills Graveling
Renovation
Post-Bid

2021 Street Improvements
Results
Goodhue, Lake City, MN

Eight intersections of Wabasha County Highway and MN Highway
Infrastructure
Results
Wabasha, MN

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

CSAH 26 - Bituminous FDR, SFDR, and Paving, Edgeline Striping and Rumble Strips
Infrastructure
Results
MN

Sealcoat
Infrastructure
Results
Wabasha, MN

Bituminous Crack Repair
Infrastructure
Results
MN

Grading, Bituminous Mill and Overlay, ADA Improvements, Lighting
Infrastructure
Results

Concrete Pavement Repairs
Infrastructure
Results
Wabasha, MN

Grading, Bituminous Surfacing
Infrastructure
Results

2022 Street and Utility Improvements
Infrastructure
Results
Kellogg, MN

Wabasha CSAH 81 from MN 60 to US Highway 61
Infrastructure
Results
Wabasha, MN

Grading, Bituminous Surfacing, Retaining Walls, Noise Walls, Ada Improvements, Signals, Lighting, Tms and Bridge Nos
New Construction, Infrastructure
Results

Reported 07/12/2022 10:51 AM
Project Title

US 63 Bridge Rehabilitation - Wisconsin Department of Transportation

Physical Address View project details and contacts
City, State (County) Lake City, MN 55041   (Wabasha County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $2,050,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a bridge / tunnel in Lake City, Minnesota. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel. Proposed rehabilitation project on the US 63 bridge at the Branch Willow River in the St. Croix County towns of Cylon and Forest. Proposed work to include: Replace the bridge deck. Repair spalling on the bridge abutment. Repair exposed rebar on girders. Replace concrete pavement approach slabs. Replace up to 50 feet of paved approach on both sides of the bridge. Replace guardrail. Place new pavement markings.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents