Similar Projects
Bull Creek Watershed Dam Structures 12 and 14
Renovation
Results
Columbus, GA 31909

Tally Green Pond Improvements
Renovation
Construction
Marietta, GA 30068

Russell Creek Reservoir Dam And Spillway System
Renovation
Post-Bid
Dawsonville, GA

Provision of Lake Louella Dam Improvements
New Construction
Results
$2,000,000 to $3,000,000 est. value
Suwanee, GA 30024

Heads Creek Reservoir Dam Rehabilitation
Renovation
Results
$7,000,000 to $9,000,000 est. value
Griffin, GA 30224

Kedron Dam Spillway and Intake Structure Repairs
Renovation
Results
$18,485 est. value
Peachtree City, GA 30269

North Broad River No.33 Watershed Structure Remedial Spillway Repair
New Construction
Results
Martin, GA 30557

Noonday Creek Watershed Structure #17
Renovation
Results
Atlanta, GA

Seven Oaks Lake Dam Improvement Project
Renovation
Results
$1,115,881 est. value
Johns Creek, GA

Rehabilitation of the Rosedale Dam for Storm Water Retention
Renovation, Alteration
Post-Bid
$5,000,000 to $10,000,000 est. value
Augusta, GA 30909

Last Updated 04/15/2022 12:46 PM
Project Title

Laura Lake Dam Rehabilitation - Construction Access Road

Physical Address View project details and contacts
City, State (County) Marietta, GA 30066   (Cobb County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,363,410 to $1,923,410
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes furnishing and installing Erosion and Sedimentation Control Best Management Practices, clearing and grubbing approx. 5 acres of wooded terrain (estimated 294 trees), grading a consgtruction access road approx. 2,600 LF in length according to the lines and grades own on the approved drawings, furnishing and installing a 6" graded aggreagate base (GAB) subgrade, a 4" aggregate (gravel) surface course of No. 34 stone, furnishing and installing storm drainage pipes and appurtenant drainage structures, ranging in size from 18" to 48" diameter as shown on teh approved drawings. Trees to be replanted in accordance to the approved drawings and re-grassing and mulching to restore the site.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents