Similar Projects
2021 Sewer Cleaning
Infrastructure
Bidding
Elgin, IL

2021 Sanitary and Storm CIPP
Infrastructure
Bidding
Geneva, IL

Sewer Root Control Treatment
Term Contract
Post-Bid
Saint Charles, IL 60174

2021 Sanitary and Storm Sewer Lining - C.I.P.P
Post-Bid
Batavia, Saint Charles, IL

2020 Sanitary Sewer Cured-in-Place Pipe Lining
Results
Less than $250,000 est. value
Carpentersville, IL 60110

2020 Miscellaneous Sewer Improvements
Results
Elgin, IL 60120

2021 Polk Avenue Roadway and Utility Improvement
Post-Bid
Carpentersville, IL

2020 Sanitary Sewer CIPP Lining
Results
Less than $1,105,662 est. value
Aurora, IL 60505

On-Call Sewer Cleaning and Televising Services
Infrastructure
Post-Bid
Geneva, IL

Geneva East Sanitary Sewer Rehabilitation
Results
$675,000 to $800,000 est. value
Geneva, IL 60134

2021 Sanitary And Storm Sewer Televising Contract
Results
Less than $164,760 est. value
Aurora, IL

2020 Sanitary Sewer Cleaning and Lining Program
Results
Less than $600,000 est. value
Elgin, IL

Trunk Sewer Main Replacement
Results
Saint Charles, IL

2020 Manhole Rehabilitation
Results
Saint Charles, IL

Sexton Street Sanitary Sewer Improvements
Results
Less than $420,785 est. value
Aurora, IL 60505

Last Updated 09/07/2021 04:35 PM
Project Title

Highland Avenue, Chicago Street, and Grove Street Storm/Sanitary Backflow Preventers

Physical Address View project details and contacts
City, State (County) Elgin, IL 60120   (Kane County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed Work is generally described follows: The purpose of this project is to prevent backwater from the Fox River in high water events into the sewer system from the Fox River. This project (City identified outfalls #13, #14 and #15 of their sewer system) includes but is not limited to furnishing all labor, materials, equipment, traffic control, and other as included items necessary for the completion of following base bid quantities: • Highland Ave. #13 Outfall – 60” Backflow Prevention Modifications Complete • Chicago St. #14 Outfall – 24” Backflow Prevention Modifications Complete • Grove Ave. #15 Outfall – 54” Backflow Prevention Modifications Complete Also includes installation of various sized precast manhole structures for the backflow installation and future access on existing sewer system; approximately 57 SY of PCC pavement removal and patching; storm sewer manhole adjustments; and other miscellaneous items of work in accordance with the Contract Plans and Specifications to prevent backwater into the sewer system from the Fox River.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents