Similar Projects
Heating, Ventilation and Air Conditioning Upgrade and Chilled Water Line Installation at the Harris County Credit Union Parking Garage
Bidding
Less than $1,000,000 est. value
Houston, TX 77002

Heating, Ventilation and Air Conditioning Upgrade and Chilled Water Line Replacement at Annex 60
Bidding
Less than $2,000,000 est. value
Houston, TX 77093

HVAC Equipment, Installation, Service, and Related Products
Post-Bid
Houston, TX 77270

Ventilation System at Annex 46
Post-Bid
Houston, TX 77002

Refurbishment of Air Handling Units
Results
$2,600,000 est. value
Houston, TX 77030

HVAC Equipment, Supplies, and Related Items
Term Contract
Results
Baytown, TX

Administration Building Mechanical Renovations
Bidding
$3,000,000 est. value
Houston, TX 77024

Administration Building HVAC Upgrades
Post-Bid
Houston, TX 77015

Chiller Replacement Project
Results
Houston, TX 77000

HVAC Refrigerants
Term Contract
Post-Bid
Houston, TX 77064

Install New Chiller
Results
Houston, TX

Galena Park Middle School HVAC Upgrades
Post-Bid
Galena Park, TX 77547

Replace Two Air Conditioning System
Results
Houston, TX 77040

Air Conditioning, Heating, and Ventilating Equipment, Parts
Post-Bid
Houston, TX 77002

Installation of Heat Exchanger at the North Bayou Central Plant for Harris County
Results
Houston, TX 77002

Last Updated 12/23/2020 03:43 PM
Project Title

6515--Liberty Eagle Fume Hoods

Physical Address View project details and contacts
City, State (County) Houston, TX 77030   (Harris County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DELIVERABLES/SCOPE OF WORK: Overview Purchase of 5 polypropylene chemical fume hoods with vented acid cabinets and flow meters. Vendor must provide abatement and removal of existing hoods. Vendor shall deliver to MEDVAMC and install the new hoods, hooking hoods to existing exhaust ducts with Fernco boots, certify/test and train on use. Order will consist of four 4-foot polypropylene chemical fume hoods with air flow monitors and one 6- foot polypropylene chemical fume hood with airflow monitor. Scope Abate and remove existing chemical fume hoods to be replace. Provide equipment to be shipped to MEDVAMC, 2002 Holcombe Blvd- Bldg. 100 Warehouse, Houston, Texas 77030. The Vendor shall provide all resources necessary to accomplish the deliverables described in the statement of work (SOW) except as may otherwise be specified. Salient characteristics- Chemical Fume hoods (4 ft or 6 ft) The chemical fume hoods are the primary engineering controls to limit exposure to hazardous chemicals, toxic fumes, vapors, gases or dust studies in research experiments. The chemical fume hood is ducted and has an exhaust fan to pull air away from the worker through the duct out into the atmosphere. The following specifications are to optimize the protection of personnel. Chemical fume hoods must be designed to have no recirculation of air to the lab, only to the outside by a connected duct and exhaust fan. Chemical fume hood face velocity a minimum of 100-120 FPM. Chemical storage cabinets directly under a the newly installed fume hood shall be ventilated to the fume hood exhaust. The chemical fume hood cabinet shall be vented using stainless steel flex ducting connecting the hood at the exhaust duct collar or Fernco boots Self- closing horizontal sash may be installed for energy conservation or a fix horizontal sash. Sashes should be horizontal and may have the capability to completely close off the hood face. Sashes should be made of safety glass. Laminated or tempered safety glass, Interior fume hood surfaces must be constructed of polypropylene with welded leak tight construction. The chemical fume hood body and acid cabinet will be made of polypropylene to take the humidity and constant temperature changes in the research building. The work surface inside the fume hood must be of the recessed type. With a recessed type work surface spills can be effectively contained by the retaining lip. Per the Cal-OSHA standards, an airflow indicator must be provided at the fume hood. A sensor with an associated audible/visual alarm is required-flow meter. Light fixtures inside the hood should be sealed and vapor tight. Must have air and vacuum valves, two corks on each side of the hood for flexibility of utility connection. Must have the ability to have electrical source located inside the hood work area for stir plates, scales, and other electrical equipment Vendor price must include abatement of existing cabinets, freight, installation, certification, testing and training. LINE ITEM QUANITY UNIT OF ISSUE 4 Air Control polypropylene chemical fume hood with 4 Each Vented acid cabinet + air flow monitor 6 Air Control polypropylene chemical fume hood with 1 Each Vented acid cabinet + air flow monitor Fernco boots to hook to existing bldg. exhaust 5 Each Certification and test of all chemical fume hoods (CFH) 5 Each Abatement and removal of existing hoods 5 Each 3. Background: Research Investigators will be utilizing the above-named equipment in support of their ongoing research projects. 4. Performance Period: The period of performance will be determined by the delivery date of the equipment to MEDVAMC. 5. Type of Contract: Firm-Fixed-Price 6. Place of Performance: MEDVAMC 2002 Holcombe Blvd. Bldg. 100, Bldg. 109, and Bldg. 110 Houston, TX 77030 B. CONTRACT AWARD MEETING No contractor award meeting will be held. C. GENERAL REQUIREMENTS 1. For every task, the contractor shall identify in writing all necessary subtasks (if any). 2. All written deliverables will be phrased in layperson language. Statistical and other technical terminology will not be used without providing a glossary of terms. D. SPECIFIC MANDATORY TASKS AND ASSOCIATED DELIVERABLES Description of Tasks and Associated Deliverables: The contractor shall provide the specific deliverables described below within the performance period stated in Section A.4 of this SOW. Abate and remove 5 existing chemical fume hoods assigned to be replaced Uncrate the chemical fume hoods Place each new chemical fume hoods (5) in its respect laboratory @ MEDVAMC. Hook each new chemical fume hood (5) to existing exhaust with Fernco boot. Certify and test each chemical fume hood (5) to prepare for use. Deliverable: 4 Air Control polypropylene chemical fume hood w/ 4 Each Vented acid cabinet + air flow monitor 6 Air Control polypropylene chemical fume hood w/ 1 Each Vented acid cabinet + air flow monitor Fernco boots to hook to existing bldg. exhaust 5 Each Certification and test of all chemical fume hoods (CFH) 5 Each Abatement and removal of existing hoods 5 Each

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Fume Hoods, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents