Similar Projects
Last Updated | 07/22/2021 12:17 PM |
Project Title | Bay Park Conveyance |
Physical Address | View project details and contacts |
City, State (County) | NY (Nassau County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | |
Project Status | Construction Commenced April 2021, No Sub Bids Needed |
Bids Due | View project details and contacts |
Estimated Value | $439,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project is to convey treated effluent from the Bay Park Sewage Treatment Plant (STP) to the existing ocean outfall at the Cedar Creek Water Pollution Control Plant (WPCP). This Project would require a force main to be constructed in three segments to connect the Bay Park STP and the Cedar Creek WPCP. One force main segment would be constructed by rehabilitating an approximately 8-mile-long portion of an existing, unused 72-inch aqueduct underneath Sunrise Highway and the other two force main segments would be new construction, approximately 2 miles and 1.5 miles in length with a diameter of 72 inches, and likely be constructed using microtunneling technology, which would require jacking and receiving shafts. Additionally, a dedicated pump station at the Bay Park STP and a receiving connection at the Cedar Creek WPCP would be required along with all related control systems and appurtenances. The Project will consist of work at three major locations: the Bay Park STP, the Cedar Creek WPCP and the force main routes connecting the facilities. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |