Similar Projects
Golf Course Greens Drainage Project
Results
$55,500 est. value
Bowie, MD 20716

Calverton Channel Rehabilitation
Post-Bid
$2,500,001 to $5,000,000 est. value
Glenarden, MD 20774

Fenced Asphalt Trail Installation
Results
Bowie, MD

Interstate 295 Miscellaneous Roadway Improvements
Post-Bid
$3,900,000 est. value
Wilmington, DE 19801

Longfield Drainage Improvements
Bidding
$2,500,001 to $5,000,000 est. value
Forestville, MD 20747

Woodhaven Lane Stormwater Management Pond
Results
Bowie, MD 20716

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Drainage Swale Maintenance Project
Results
Bowie, MD

On-Call Drainage and Stormwater Remediation
Results
$5,000,001 to $10,000,000 est. value
Baltimore, MD

Algae and Vegetation Treatment Services for Stormwater Ponds
Results
Bowie, MD

Stormwater and Roadway Drainage Maintenance Services
Results

Slope Erosion Repair and Stabilization
Post-Bid
Forest Heights, MD

Cree Drive Drainage Improvements and Road Repair
Bidding
Forest Heights, MD 20745

Pipes and Structures Replacement Program for Storm Drains
Term Contract
Post-Bid
$2,500,001 to $5,000,000 est. value
Largo, MD 20774

Cabin 11 - Foundation Waterproofing, New Germany State Park, Garrett County
Results
Less than $50,000 est. value
Grantsville, MD 21536

Last Updated 06/10/2020 03:02 PM
Project Title

Saddlebrook Stream Restoration

Physical Address View project details and contacts
City, State (County) Bowie, MD 20716   (Prince Georges County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of restoring approximately 1,250 linear feet of actively eroding perennial channel along the Main Stem and 150 linear feet of ephemeral channel along the Outfall Tributary. Regenerative stream conveyance (RSC) systems and a Step Pool Conveyance System (SPSC) are proposed to improve channel stability and provide water quality treatment for storm flows from storm drain outfalls along the Main Stem and Outfall Tributary. A new storm drain end wall is also proposed to replace a failing open pipe, and an exposed sanitary sewer pipe will be protected along the Main Stem.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents