Similar Projects
2020 Concrete Rehab-Ada Improvements
Post-Bid
$370,000 to $390,000 est. value
Wheat Ridge, CO

W-Line Shared Use Path - Oak to Kipling and Zephyr to Wadsworth
Post-Bid
Lakewood, CO 80228

Parking Lot Maintenance
Results
Golden, CO 80401

Signal Replacement with Curb Ramps and Minor Signing and Striping
Results
$1,000,000 to $5,000,000 est. value

Pierce and 17th Avenue Crosswalk
Post-Bid
Lakewood, CO 80226

Union and 6th Avenue On-Ramp Median Reconstruction
Results
Lakewood, CO 80226

Sidewalk Improvements on 13th Avenue (Lamar Street West) and Wadsworth Boulevard (Mansfield Avenue South)
Post-Bid
Lakewood, CO 80226

West 50th Avenue Sidewalk (SRTS) Between Fairmount Elementary & Mcintyre Street
Results
Golden, CO 80419

Improvements of Walkways, Curbs, Trails and Parking Lots at Five Parks
Post-Bid
Evergreen, CO 80439

Open Space North 40 Parking Lot Asphalt Replacement
Term Contract
Results
Less than $50,000 est. value
Golden, CO 80401

Climbing Access Trail Construction
Post-Bid
CO

2020 Safe Routes to School - Pierce Street Project
Results
$300,000 to $350,000 est. value
Edgewater, CO 80214

2021 Concrete Rehab-Ada Improvements
Post-Bid
$200,000 to $250,000 est. value
Wheat Ridge, CO

Ada Curb Ramp Upgrades
Results
$1,000,000 to $5,000,000 est. value

Sidewalk Elevation Differential Mitigation (Sawing)
Post-Bid
Lakewood, CO

Last Updated 05/07/2020 10:54 AM
Project Title

Concrete ADA Compliant Ramps at Campbell Cottages

Physical Address View project details and contacts
City, State (County) Arvada, CO 80005   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of concrete ADA compliant access ramps on front and rear of the preschool at Campbell Cottages (10425 West 64th Place Arvada, CO) and re-route a portion of existing sidewalk in the rear of the building to not be in conflict with new concrete ramp. Work will include removing existing concrete, installing new ramps and landings and handrails as required by the Americans with Disabilities Act of 1990 (1:12 ramp slope, 5’ by 5’ unobstructed area top and bottom, 36” clear width on ramp, etc.)

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents