Similar Projects
Last Updated | 09/14/2023 06:35 AM |
Project Title | 181 Intelligence Wing - Terre Haute - Building 38 Renovation |
Physical Address | View project details and contacts |
City, State (County) | Terre Haute, IN 47803 (Vigo County) |
Category(s) | Government/Public |
Sub-Category(s) | Military Facility |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,798,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Invitation for Bid (IFB) - TOTAL SMALL BUSINESS SET-ASIDE Location: Building 38, 900 S. Petercheff Street, Terre Haute, IN 47803 NAICS Code: 236220 - Commercial and Institutional Building Construction The 181st Intelligence Wing, Indiana Air National Guard intends to issue an Invitation for Bids to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary for the renovation of. Base Bid 1 - Bldg 38 Renovation: The purpose of this requirement is to utilize government provided designs/specs/drawings to renovate the 13,841 SF building 38 located at the 181st Intelligence Wing in Terre Haute, IN. The building renovation work incudes removing and replacing the HVAC system, replacement of carpeting, construct new walls, supporting electrical, security and fire protection work and some exterior wall and soffit work. A portion of the facility will be upgraded to a ICD 705 compliant space. Base Bid 2 - Purchase and install two boilers in accordance with specifications outline wtihin this document. Purchase and install all HVAC distribution ducting in accordance with specifications outlined within this document. Additive Bid Item (ABI) 1: The existing Men's and Women's restrooms will have (1) fiberglass ABA shower unit added to each with a small changing area and privacy curtain. To add showers, some of the floor slab will need to be trenched to connect the new drain lines to existing, and then replaced with new slab and tile finish. The existing plumbing fixtures will be replaced in their current locations and new toilet partitions will be provided in similar layout. The existing floor and wall tile will remain and be cleaned. Lockers will be installed by the Government from their current stock. Additive Bid Item (ABI) 2: Add furred out, metal panel fascia external to the top of all four elevations as an approximately 4' tall horizontal band similar to adjacent Building 37. Coordinate removal and/or replacement of wall mounted components affected by this project, e.g. HVAC equipment conduits, gutters & downspouts, lights, security cameras, roof access ladder, etc. The contract duration of this requirement will be 220 days after notice to proceed. This project is set aside 100% for Small Businesses concerns. The North American Industry Classification (NAICS) Code is 236220, with a size standard of $39,500,000.00. The magnitude of construction is between $1,000,000 and $5,000,000. Your attention is directed to FAR Clause 52.219-14(e)(3) (DEVIATION 2019-O0003), LIMITATIONS ON SUBCONTRACTING, which states "By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract in the case of a contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 85 percent subcontract amount that cannot be exceeded". The solicitation and associated information and the plans and specifications are available in the solicitation posting and only from the Contract Opportunities page at SAM.gov. In accordance with FAR 36.211(b), the following information is provided: (1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204. (2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available, but will be compiled and provided in future announcements. DISCLAIMER: The official plans and specifications will be provided by the Government to interest parties for this solicitation and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offeror's responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the documents posted on the referenced web pages. The Government will not issue paper copies. All questions and requests for information (RFI) must be received NOT LATER THAN 12 July 2023 at 1:00PM EST. OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS EARLY IN THIS PROCESS. Failure to submit bids by the time of closing due to an untimely submission of RFIs will be at no fault of the government. Bid Results Base 1 - Bldg 38 Renovation (SRM) - C. Rallo Contracting Co., Inc - $2573000 Base 2 - Boiler & HVAC Ducting (Minor Construction - C. Rallo Contracting Co., Inc - $225000 |
||||||||||||||||||||||||||||||||||||
Details | 13,841 SF.
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |